2008 |
22 | EE | Peng Wang,
Peter B. Luh,
Shi-Chuang Chang,
Jin Sun:
Modeling and Optimization of Crowd Guidance for Building Emergency Evacuation.
ICIRA (2) 2008: 1-6 |
21 | EE | Aiying Rong,
Risto Lahdelma,
Peter B. Luh:
Lagrangian relaxation based algorithm for trigeneration planning with storages.
European Journal of Operational Research 188(1): 240-257 (2008) |
2007 |
20 | EE | Feng Zhang,
Eugene Santos Jr.,
Peter B. Luh:
A Performance Study on a Multiagent E-Scheduling and Coordination Framework for Maintenance Networks.
IEEE Transactions on Systems, Man, and Cybernetics, Part C 37(1): 52-65 (2007) |
2006 |
19 | | Jin Sun,
Qianchuan Zhao,
Peter B. Luh,
Mikhail J. Atalla:
Estimation of Optimal Elevator Scheduling Performance.
ICRA 2006: 1078-1083 |
18 | | Tao Sun,
Peter B. Luh,
Min Liu:
Lagrangian Relaxation for Complex Job Shop Scheduling.
ICRA 2006: 1432-1437 |
2005 |
17 | | Bo Xiong,
Peter B. Luh,
Shi-Chung Chang:
Group Elevator Scheduling with Advanced Traffic Information for Normal Operations and Coordinated Emergency Evacuation.
ICRA 2005: 1419-1424 |
2004 |
16 | EE | Danqing Yu,
Peter B. Luh:
Achieving Reliable Delivery in Supply Chains: the Control of Uncertainties.
ICRA 2004: 2693-2698 |
2003 |
15 | | Yan Tu,
Peter B. Luh,
Weidong Feng,
Katsumi Narimatsu:
Supply chain performance evaluation: a simulation study.
ICRA 2003: 1749-1755 |
14 | | Ming Ni,
Peter B. Luh,
Bryan Moser:
An optimization-based approach for distributed project scheduling.
ICRA 2003: 1756-1761 |
13 | | Feng Zhang,
Eugene Santos Jr.,
Peter B. Luh:
Mobile Multi-Agent-Based Scheduling and Coordination of Maintenance Networks.
PDPTA 2003: 279-285 |
12 | EE | Eugene Santos Jr.,
Feng Zhang,
Peter B. Luh:
Intra-Organizational Logistics Management Through Multi-Agent Systems.
Electronic Commerce Research 3(3-4): 337-364 (2003) |
11 | EE | Haoxun Chen,
Peter B. Luh:
An alternative framework to Lagrangian relaxation approach for job shop scheduling.
European Journal of Operational Research 149(3): 499-512 (2003) |
2002 |
10 | | Yan Tu,
Peter B. Luh,
Ming Ni,
Lakshman S. Thakur:
Internet-Based Manufacturing Scheduling: Architecture and Implementation.
ICRA 2002: 1107-1112 |
2001 |
9 | | Haoxun Chen,
Peter B. Luh,
Lei Fang:
A Time Window Based Approach for Job Shop Scheduling.
ICRA 2001: 842-847 |
8 | EE | Kuan-Hung Chen,
Shi-Chung Chang,
Tzi-Dar Chiueh,
Peter B. Luh,
Xing Zhao:
SIMD architecture for job shop scheduling problem solving.
ISCAS (4) 2001: 530-533 |
7 | | Eugene Santos Jr.,
Jeng Zhang,
Peter B. Luh:
Multi-Agent Logistics Management.
International Conference on Internet Computing (1) 2001: 240-246 |
2000 |
6 | | Haoxun Chen,
Peter B. Luh:
Scheduling and Coordination in Manufacturing Enterprise Automation.
ICRA 2000: 389-394 |
1999 |
5 | | Peter B. Luh,
Xiaohui Zhou,
Robert N. Tomastik:
An Effective Method to Reduce Inventory in Job Shops.
ICRA 1999: 787-792 |
1998 |
4 | | Peter B. Luh,
Xing Zhao,
Yajun Wang:
Lagrangian Relaxation Neural Networks for Job Shop Scheduling.
ICRA 1998: 1799-1804 |
1995 |
3 | | Jihua Wang,
Peter B. Luh:
Optimiztion-Based Scheduling of a Machining Center.
ICRA 1995: 502-507 |
1994 |
2 | | Yong Li,
Peter B. Luh,
Xiaohong Guan:
Fuzzy Optimization-Based Scheduling of Identical Machines with Possible Breakdown.
ICRA 1994: 3447-3452 |
1993 |
1 | | Debra J. Hoitomt,
Peter B. Luh:
Scheduling the Dynamic Job Shop.
ICRA (3) 1993: 71-76 |