2008 |
10 | EE | Yi-Nung Yang,
Shi-Chung Chang:
A contract of purchase commitments on shared yields as a risk-sharing mechanism among fabless-foundry partnership.
Winter Simulation Conference 2008: 2244-2250 |
9 | EE | Shi-Chung Chang,
Shin-Shyu Su,
Ke-Ju Chen:
Priority mix planning for cycle time-differentiated semiconductor manufacturing services.
Winter Simulation Conference 2008: 2251-2259 |
2005 |
8 | | Bo Xiong,
Peter B. Luh,
Shi-Chung Chang:
Group Elevator Scheduling with Advanced Traffic Information for Normal Operations and Coordinated Emergency Evacuation.
ICRA 2005: 1419-1424 |
2004 |
7 | EE | Tsung-Ching Lin,
Yeali S. Sun,
Shi-Chung Chang,
Shao-I Chu,
Yi-Ting Chou,
Mei-Wen Li:
Management of abusive and unfair Internet access by quota-based priority control.
Computer Networks 44(4): 441-462 (2004) |
2003 |
6 | | Bo-Wei Hsieh,
Shi-Chung Chang,
Chun-Hung Chen:
Efficient Selection of Scheduling Rule Combination by Combining Design of Experiment and Ordinal Optimization-Based Simulation.
ICRA 2003: 163-168 |
5 | EE | Tsung-Ching Lin,
Yeali S. Sun,
Shi-Chung Chang,
Shao-I Chu,
Yi-Ting Chou,
Mei-Wen Li:
Priority-Based Internet Access Control for Fairness Improvement and Abuse Reduction.
QoS-IP 2003: 659-671 |
2001 |
4 | | Bo-Wei Hsieh,
Shi-Chung Chang,
Chun-Hung Chen:
Dynamic Scheduling Rule Selection for Semiconductor Wafer Fabrication.
ICRA 2001: 535-540 |
3 | EE | Kuan-Hung Chen,
Shi-Chung Chang,
Tzi-Dar Chiueh,
Peter B. Luh,
Xing Zhao:
SIMD architecture for job shop scheduling problem solving.
ISCAS (4) 2001: 530-533 |
1995 |
2 | EE | Jin-Fu Chang,
Shi-Chung Chang,
Zsehong Tsai,
Jung-Shyr Wu,
Hsu-Chun Yen:
Design, implementation, and applications of a B-ISDN simulation testbed.
Annual Simulation Symposium 1995: 212-219 |
1993 |
1 | | Da-Yin Liao,
Shi-Chung Chang,
Shou-Ren Yen,
Cheng-Chung Chien:
Daily Scheduling for R&D Semiconductor Fabrication.
ICRA (3) 1993: 77-82 |