2002 |
11 | EE | Cho W. Moon,
Harish Kriplani,
Krishna P. Belkhale:
Timing model extraction of hierarchical blocks by graph reduction.
DAC 2002: 152-157 |
1999 |
10 | EE | Sumit Roy,
Krishna P. Belkhale,
Prithviraj Banerjee:
An Approxmimate Algorithm for Delay-Constraint Technology Mapping.
DAC 1999: 367-372 |
1995 |
9 | EE | Krishna P. Belkhale,
Alexander J. Suess:
Timing analysis with known false sub graphs.
ICCAD 1995: 736-740 |
1993 |
8 | EE | Krishna P. Belkhale,
Randall J. Brouwer,
Prithviraj Banerjee:
Task scheduling for exploiting parallelism and hierarchy in VLSI CAD algorithms.
IEEE Trans. on CAD of Integrated Circuits and Systems 12(5): 557-567 (1993) |
1992 |
7 | | Krishna P. Belkhale,
Prithviraj Banerjee:
Reconfiguration Strategies for VLSI Processor Arrays and Trees Using a Modified Diogenes Approach.
IEEE Trans. Computers 41(1): 83-96 (1992) |
6 | | Krishna P. Belkhale,
Prithviraj Banerjee:
Parallel Algorithms for Geometric Connected Component Labeling on a Hypercube Multiprocessor.
IEEE Trans. Computers 41(6): 699-709 (1992) |
1991 |
5 | | Krishna P. Belkhale,
Prithviraj Banerjee:
A Scheduling Algorithm for Parallelizable Dependent Tasks.
IPPS 1991: 500-506 |
4 | EE | Krishna P. Belkhale,
Prithviraj Banerjee:
Parallel algorithms for VLSI circuit extraction.
IEEE Trans. on CAD of Integrated Circuits and Systems 10(5): 604-618 (1991) |
1990 |
3 | | Krishna P. Belkhale,
Prithviraj Banerjee:
A Parallel Algorithm for Hierarchical Circuit Extraction.
ICCAD 1990: 236-239 |
2 | | Krishna P. Belkhale,
Prithviraj Banerjee:
An Approximate Algorithm for the Partitionable Independent Task Scheduling Problem.
ICPP (1) 1990: 72-75 |
1 | | Krishna P. Belkhale,
Prithviraj Banerjee:
Geometric Connected Component Labeling on Distributed Memory Multicomputers.
ICPP (3) 1990: 291-294 |