2009 |
27 | EE | Michal Kosiedowski,
Cezary Mazurek,
Maciej Stroinski,
Jan Weglarz:
Medical Digital Library Services as an Improvement of the Teleconsultation System in the Regional Health Network.
eTELEMED 2009: 154-159 |
2008 |
26 | EE | Marek Mika,
Grzegorz Waligóra,
Jan Weglarz:
Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times.
European Journal of Operational Research 187(3): 1238-1250 (2008) |
25 | EE | Krzysztof Kurowski,
Jarek Nabrzyski,
Ariel Oleksiak,
Jan Weglarz:
A multicriteria approach to two-level hierarchy scheduling in grids.
J. Scheduling 11(5): 371-379 (2008) |
2007 |
24 | EE | Krzysztof Kurowski,
Jarek Nabrzyski,
Ariel Oleksiak,
Jan Weglarz:
Grid scheduling simulations with GSSIM.
ICPADS 2007: 1-8 |
2006 |
23 | EE | Jacek Blazewicz,
Mikhail Y. Kovalyov,
Maciej Machowiak,
Denis Trystram,
Jan Weglarz:
Preemptable Malleable Task Scheduling Problem.
IEEE Trans. Computers 55(4): 486-490 (2006) |
2005 |
22 | | Artur Binczewski,
Michal Przybylski,
Maciej Stroinski,
Jan Weglarz:
Porta Optica - Distributed Optical Gateway to GÉANT2.
TNC 2005 |
21 | EE | Marek Mika,
Grzegorz Waligóra,
Jan Weglarz:
Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models.
European Journal of Operational Research 164(3): 639-668 (2005) |
20 | EE | Vicente Valls,
Jan Weglarz:
Project management and scheduling.
European Journal of Operational Research 165(2): 285-288 (2005) |
2004 |
19 | EE | Paul Graham,
Matti Heikkurinen,
Jarek Nabrzyski,
Ariel Oleksiak,
Mark Parsons,
Heinz Stockinger,
Kurt Stockinger,
Maciej Stroinski,
Jan Weglarz:
EU Funded Grid Development in Europe.
European Across Grids Conference 2004: 1-10 |
18 | EE | Joanna Józefowska,
Marek Mika,
Rafal Rózycki,
Grzegorz Waligóra,
Jan Weglarz:
An Almost Optimal Heuristic for Preemptive Cmax Scheduling of Dependent Tasks on Parallel Identical Machines.
Annals OR 129(1-4): 205-216 (2004) |
17 | EE | Jacek Blazewicz,
Maciej Machowiak,
Jan Weglarz,
Mikhail Y. Kovalyov,
Denis Trystram:
Scheduling Malleable Tasks on Parallel Processors to Minimize the Makespan.
Annals OR 129(1-4): 65-80 (2004) |
2001 |
16 | EE | Joanna Józefowska,
Marek Mika,
Rafal Rózycki,
Grzegorz Waligóra,
Jan Weglarz:
Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling.
Annals OR 102(1-4): 137-155 (2001) |
15 | EE | Artur Binczewski,
Norbert Meyer,
Jaroslaw Nabrzyski,
Stanislaw Starzak,
Maciej Stroinski,
Jan Weglarz:
First experiences with the Polish Optical Internet.
Computer Networks 37(6): 747-759 (2001) |
2000 |
14 | EE | Jacek Blazewicz,
Maciej Machowiak,
Jan Weglarz,
Grégory Mounié,
Denis Trystram:
Schedulling Malleable Task with Convex Processing Speed Functions.
Computación y Sistemas 4(2): 158-165 (2000) |
1999 |
13 | EE | Joanna Józefowska,
Marek Mika,
Rafal Rózycki,
Grzegorz Waligóra,
Jan Weglarz:
Discrete-continuous Scheduling to Minimize the Makespan for Power Processing Rates of Jobs.
Discrete Applied Mathematics 94(1-3): 263-285 (1999) |
12 | | Jacek Blazewicz,
Piotr Formanowicz,
Marta Kasprzak,
Wojciech T. Markiewicz,
Jan Weglarz:
DNA Sequencing With Positive and Negative Errors.
Journal of Computational Biology 6(1): 113-124 (1999) |
1998 |
11 | EE | Mscislaw Nakonieczny,
Stanislaw Starzak,
Maciej Stroinski,
Jan Weglarz:
Polish Scientific Broadband Network: POL34.
Computer Networks 30(16-18): 1669-1676 (1998) |
1997 |
10 | | Jacek Blazewicz,
Janusz Kaczmarek,
Marta Kasprzak,
Wojciech T. Markiewicz,
Jan Weglarz:
Sequential and parallel algorithms for DNA sequencing.
Computer Applications in the Biosciences 13(2): 151-158 (1997) |
1996 |
9 | EE | Jacek Blazewicz,
Maciej Drozdowski,
Dominique de Werra,
Jan Weglarz:
Deadline Scheduling of Multiprocessor Tasks.
Discrete Applied Mathematics 65(1-3): 81-95 (1996) |
1986 |
8 | | Jacek Blazewicz,
Mieczyslaw Drabowski,
Jan Weglarz:
Scheduling Multiprocessor Tasks to Minimize Schedule Length.
IEEE Trans. Computers 35(5): 389-393 (1986) |
1984 |
7 | | Jacek Blazewicz,
Jan Weglarz,
Mieczyslaw Drabowski:
Scheduling Independent 2-Processor Tasks to Minimize Schedule Length.
Inf. Process. Lett. 18(5): 267-273 (1984) |
1980 |
6 | | Jan Weglarz:
Multiprocessor Scheduling with Memory Allocation - A Deterministic Approach.
IEEE Trans. Computers 29(8): 703-709 (1980) |
1979 |
5 | | Jacek Blazewicz,
Jan Weglarz:
Scheduling under Resource Constraints - Achievements and Prospects.
Performance 1979: 181-199 |
1977 |
4 | | Jan Weglarz:
Scheduling Dependent Tasks with Memory Allocation in Multiprocessing Systems to Minimize Schedule Length.
Modelle für Rechensysteme 1977: 109-119 |
3 | EE | Jan Weglarz,
Jacek Blazewicz,
Wojciech Cellary,
Roman Slowinski:
Algorithm 520: An Automatic Revised Simplex Method for Constrained Resource Network Scheduling [H].
ACM Trans. Math. Softw. 3(3): 295-300 (1977) |
2 | | Jacek Blazewicz,
Wojciech Cellary,
Jan Weglarz:
A strategy for scheduling splittable tasks to reduce schedule length.
Acta Cybern. 3: 99-106 (1977) |
1976 |
1 | | Jan Weglarz:
Scheduling with Memory Allocation in Multiprocessing Systems.
Performance 1976: 513-514 |