Volume 102,
Numbers 1-4,
February 2001
 
- Gündüz Ulusoy, Willy Herroelen:
 Preface.
13-16
 Electronic Edition (link) BibTeX
- Vicente Valls Verdejo, M. Pilar Lino Sorlí:
 Criticality Analysis in Activity-on-Node Networks with Minimal Time Lags.
17-37
 Electronic Edition (link) BibTeX
- R. Alan Bowman:
 Due Date-Based Metrics for Activity Importance in Stochastic Activity Networks.
39-48
 Electronic Edition (link) BibTeX
- Arfst Ludwig, Rolf H. Möhring, Frederik Stork:
 A Computational Study on Bounding the Makespan Distribution in Stochastic Project Networks.
49-64
 Electronic Edition (link) BibTeX
- María Pilar Tormos, Antonio Luis Lova:
 A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling.
65-81
 Electronic Edition (link) BibTeX
- Javier Alcaraz, Concepción Maroto:
 A Robust Genetic Algorithm for Resource Allocation in Project Scheduling.
83-109
 Electronic Edition (link) BibTeX
- Sönke Hartmann:
 Project Scheduling with Multiple Modes: A Genetic Algorithm.
111-135
 Electronic Edition (link) BibTeX
- Joanna Józefowska, Marek Mika, Rafal Rózycki, Grzegorz Waligóra, Jan Weglarz:
 Simulated Annealing for Multi-Mode Resource-Constrained Project Scheduling.
137-155
 Electronic Edition (link) BibTeX
- Linet Özdamar, Ebru Alanya:
 Uncertainty Modelling in Software Development Projects (With Case Study).
157-178
 Electronic Edition (link) BibTeX
- Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
 An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem.
179-196
 Electronic Edition (link) BibTeX
- Nalini Dayanand, Rema Padman:
 A Two Stage Search Heuristic for Scheduling Payments in Projects.
197-220
 Electronic Edition (link) BibTeX
- Alf Kimms:
 Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds.
221-236
 Electronic Edition (link) BibTeX
- Gündüz Ulusoy, Funda Sivrikaya-Serifoglu, Sule Önsel Sahin:
 Four Payment Models for the Multi-Mode Resource Constrained Project Scheduling Problem with Discounted Cash Flows.
237-261
 Electronic Edition (link) BibTeX
- Antonio Luis Lova, María Pilar Tormos:
 Analysis of Scheduling Schemes and Heuristic Rules Performance in Resource-Constrained Multiproject Scheduling.
263-286
 Electronic Edition (link) BibTeX
- Chung-Yee Lee, Lei Lei:
 Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases.
287-307
 Electronic Edition (link) BibTeX
Copyright © Sat May 16 23:50:33 2009
 by Michael Ley (ley@uni-trier.de)