2008 | ||
---|---|---|
40 | EE | Alexandre Dolgui, Mikhail Y. Kovalyov, Kseniya Shchamialiova: Lot-Sizing and Sequencing on a Single Imperfect Machine. MCO 2008: 117-125 |
39 | EE | T. C. Edwin Cheng, Mikhail Y. Kovalyov, C. T. Ng, S. S. Lam: Group sequencing around a common due date. Discrete Optimization 5(3): 594-604 (2008) |
38 | EE | Ali Allahverdi, C. T. Ng, T. C. Edwin Cheng, Mikhail Y. Kovalyov: A survey of scheduling problems with setup times or costs. European Journal of Operational Research 187(3): 985-1032 (2008) |
37 | EE | M. S. Barketau, T. C. Edwin Cheng, Mikhail Y. Kovalyov: Batch scheduling of deteriorating reworkables. European Journal of Operational Research 189(3): 1317-1326 (2008) |
36 | EE | Mikhail Y. Kovalyov, Silvano Martello: Combinatorics for modern manufacturing, logistics and supply chains (ECCO XVIII). European Journal of Operational Research 189(3): 803-806 (2008) |
35 | EE | Sergei Chubanov, Mikhail Y. Kovalyov, Erwin Pesch: A single-item economic lot-sizing problem with a non-uniform resource: Approximation. European Journal of Operational Research 189(3): 877-889 (2008) |
34 | EE | M. S. Barketau, T. C. Edwin Cheng, C. T. Ng, Vladimir Kotov, Mikhail Y. Kovalyov: Batch scheduling of step deteriorating jobs. J. Scheduling 11(1): 17-28 (2008) |
2007 | ||
33 | EE | Mikhail Y. Kovalyov, Frank Werner: Problem F. European Journal of Operational Research 177(2): 1310-1311 (2007) |
32 | EE | Mikhail Y. Kovalyov, C. T. Ng, T. C. Edwin Cheng: Fixed interval scheduling: Models, applications, computational complexity and algorithms. European Journal of Operational Research 178(2): 331-342 (2007) |
31 | EE | Fawaz S. Al-Anzi, Ali Allahverdi, Mikhail Y. Kovalyov: Batching deteriorating items with applications in computer communication and reverse logistics. European Journal of Operational Research 182(3): 1002-1011 (2007) |
30 | EE | Adam Janiak, Mikhail Y. Kovalyov, Marcin Marek: Soft Due Window Assignment and Scheduling on Parallel Machines. IEEE Transactions on Systems, Man, and Cybernetics, Part A 37(5): 614-620 (2007) |
29 | EE | Jacek Blazewicz, Edmund K. Burke, Marta Kasprzak, Alexandr Kovalev, Mikhail Y. Kovalyov: Simplified Partial Digest Problem: Enumerative and Dynamic Programming Algorithms. IEEE/ACM Trans. Comput. Biology Bioinform. 4(4): 668-680 (2007) |
28 | EE | C. T. Ng, Mikhail Y. Kovalyov: Batching and scheduling in a multi-machine flow shop. J. Scheduling 10(6): 353-364 (2007) |
2006 | ||
27 | EE | Karl Inderfurth, Adam Janiak, Mikhail Y. Kovalyov, Frank Werner: Batching work and rework processes with limited deterioration of reworkables. Computers & OR 33: 1595-1605 (2006) |
26 | EE | Adam Janiak, Mikhail Y. Kovalyov: Scheduling in a contaminated area: A model and polynomial algorithms. European Journal of Operational Research 173(1): 125-132 (2006) |
25 | EE | T. C. Edwin Cheng, Mikhail Y. Kovalyov, Natalia V. Shakhlevich: Scheduling with controllable release dates and processing times: Makespan minimization. European Journal of Operational Research 175(2): 751-768 (2006) |
24 | EE | T. C. Edwin Cheng, Mikhail Y. Kovalyov, Natalia V. Shakhlevich: Scheduling with controllable release dates and processing times: Total completion time minimization. European Journal of Operational Research 175(2): 769-781 (2006) |
23 | EE | Jacek Blazewicz, Mikhail Y. Kovalyov, Maciej Machowiak, Denis Trystram, Jan Weglarz: Preemptable Malleable Task Scheduling Problem. IEEE Trans. Computers 55(4): 486-490 (2006) |
22 | EE | Adam Janiak, Mikhail Y. Kovalyov: Job Sequencing with Exponential Functions of Processing Times. Informatica, Lith. Acad. Sci. 17(1): 13-24 (2006) |
21 | EE | Mikhail Y. Kovalyov, Marie-Claude Portmann, Ammar Oulamara: Optimal testing and repairing a failed series system. J. Comb. Optim. 12(3): 279-295 (2006) |
20 | EE | Sergei Chubanov, Mikhail Y. Kovalyov, Erwin Pesch: An FPTAS for a single-item capacitated economic lot-sizing problem with monotone cost structure. Math. Program. 106(3): 453-466 (2006) |
2005 | ||
19 | EE | C. T. Ng, T. C. Edwin Cheng, Adam Janiak, Mikhail Y. Kovalyov: Group Scheduling with Controllable Setup and Processing Times: Minimizing Total Weighted Completion Time. Annals OR 133(1-4): 163-174 (2005) |
18 | EE | Adam Janiak, Mikhail Y. Kovalyov, Marie-Claude Portmann: Single machine group scheduling with resource dependent setup and processing times. European Journal of Operational Research 162(1): 112-121 (2005) |
17 | EE | Adam Janiak, Mikhail Y. Kovalyov, Wieslaw Kubiak, Frank Werner: Positive half-products and scheduling with controllable processing times. European Journal of Operational Research 165(2): 416-422 (2005) |
2004 | ||
16 | EE | Mohamed Ali Aloulou, Mikhail Y. Kovalyov, Marie-Claude Portmann: Maximization Problems in Single Machine Scheduling. Annals OR 129(1-4): 21-32 (2004) |
15 | EE | Jacek Blazewicz, Maciej Machowiak, Jan Weglarz, Mikhail Y. Kovalyov, Denis Trystram: Scheduling Malleable Tasks on Parallel Processors to Minimize the Makespan. Annals OR 129(1-4): 65-80 (2004) |
14 | EE | C. T. Daniel Ng, T. C. Edwin Cheng, Mikhail Y. Kovalyov: Single machine batch scheduling with jointly compressible setup and processing times. European Journal of Operational Research 153(1): 211-219 (2004) |
13 | EE | Mikhail Y. Kovalyov, Chris N. Potts, Vitaly A. Strusevich: Batching decisions for assembly production systems. European Journal of Operational Research 157(3): 620-642 (2004) |
2003 | ||
12 | EE | C. T. Daniel Ng, T. C. Edwin Cheng, Mikhail Y. Kovalyov, S. S. Lam: Single machine scheduling with a variable common due date and resource-dependent processing times. Computers & OR 30(8): 1173-1185 (2003) |
11 | EE | T. C. Edwin Cheng, Mikhail Y. Kovalyov: Scheduling a Single Server in a Two-machine Flow Shop. Computing 70(2): 167-180 (2003) |
2002 | ||
10 | EE | T. C. Edwin Cheng, Mikhail Y. Kovalyov: An unconstrained optimization problem is NP-hard given an oracle representation of its objective function: a technical note. Computers & OR 29(14): 2087-2091 (2002) |
9 | EE | Aleksander Bachman, Adam Janiak, Mikhail Y. Kovalyov: Minimizing the total weighted completion time of deteriorating jobs. Inf. Process. Lett. 81(2): 81-84 (2002) |
8 | EE | Mikhail Y. Kovalyov, Marcus Pattloch, Günter Schmidt: A polynomial algorithm for lot-size scheduling of two type tasks. Inf. Process. Lett. 83(4): 229-235 (2002) |
7 | Mikhail Y. Kovalyov, Frank Werner: Approximation Schemes for Scheduling Jobs with Common Due Date on Parallel Machines to Minimize Total Tardiness. J. Heuristics 8(4): 415-428 (2002) | |
2001 | ||
6 | EE | T. C. Edwin Cheng, Mikhail Y. Kovalyov: Single Supplier Scheduling for Multiple Deliveries. Annals OR 107(1-4): 51-63 (2001) |
1998 | ||
5 | EE | Mikhail Y. Kovalyov, Yakov M. Shafransky: Uniform Machine Scheduling of Unit-time Jobs Subject to Resource Constraints. Discrete Applied Mathematics 84(1-3): 253-257 (1998) |
4 | Mikhail Y. Kovalyov, Wieslaw Kubiak: A Fully Polynomial Approximation Scheme for Minimizing Makespan of Deteriorating Jobs. J. Heuristics 3(4): 287-297 (1998) | |
1997 | ||
3 | EE | Mikhail Y. Kovalyov: Batch Scheduling and Common Due Date Assignment Problem: an NP-hard Case. Discrete Applied Mathematics 80(2-3): 251-254 (1997) |
2 | EE | Mikhail Y. Kovalyov, Yakov M. Shafransky: Batch Scheduling with Deadlines on Parallel Machines: An NP-Hard Case. Inf. Process. Lett. 64(2): 69-74 (1997) |
1996 | ||
1 | EE | T. C. Edwin Cheng, Mikhail Y. Kovalyov: Batch Scheduling and Common Due-date Assignment on a Single Machine. Discrete Applied Mathematics 70(3): 231-245 (1996) |