| 2006 |
| 10 | EE | Ravindra Jejurikar,
Rajesh Gupta:
Optimized Slowdown in Real-Time Task Systems.
IEEE Trans. Computers 55(12): 1588-1598 (2006) |
| 9 | EE | Ravindra Jejurikar,
Rajesh K. Gupta:
Energy-aware task scheduling with task synchronization for embedded real-time systems.
IEEE Trans. on CAD of Integrated Circuits and Systems 25(6): 1024-1037 (2006) |
| 2005 |
| 8 | EE | Ravindra Jejurikar,
Rajesh K. Gupta:
Dynamic slack reclamation with procrastination scheduling in real-time embedded systems.
DAC 2005: 111-116 |
| 7 | EE | Ravindra Jejurikar,
Rajesh K. Gupta:
Energy Aware Non-Preemptive Scheduling for Hard Real-Time Systems.
ECRTS 2005: 21-30 |
| 2004 |
| 6 | EE | Ravindra Jejurikar,
Cristiano Pereira,
Rajesh K. Gupta:
Leakage aware dynamic voltage scaling for real-time embedded systems.
DAC 2004: 275-280 |
| 5 | EE | Ravindra Jejurikar,
Rajesh K. Gupta:
Optimized Slowdown in Real-Time Task Systems.
ECRTS 2004: 155-164 |
| 4 | EE | Ravindra Jejurikar,
Rajesh K. Gupta:
Dynamic voltage scaling for systemwide energy minimization in real-time embedded systems.
ISLPED 2004: 78-81 |
| 3 | EE | Ravindra Jejurikar,
Rajesh K. Gupta:
Procrastination scheduling in fixed priority real-time systems.
LCTES 2004: 57-66 |
| 2002 |
| 2 | EE | Ravindra Jejurikar,
Rajesh K. Gupta:
Energy aware task scheduling with task synchronization for embedded real time systems.
CASES 2002: 164-169 |
| 2000 |
| 1 | EE | Dinesh Ramanathan,
Ravindra Jejurikar,
Rajesh K. Gupta:
Timing driven co-design of networked embedded systems.
ASP-DAC 2000: 117-122 |