2009 |
35 | EE | Qi Li,
Mingshu Li,
Ye Yang,
Qing Wang,
Thomas Tan,
Barry W. Boehm,
Chenyong Hu:
Bridge the Gap between Software Test Process and Business Value: A Case Study.
ICSP 2009: 212-223 |
34 | EE | Lei He,
Juan Li,
Qing Wang,
Ye Yang:
Predicting Upgrade Project Defects Based on Enhancement Requirements: An Empirical Study.
ICSP 2009: 268-279 |
33 | EE | Ye Yang,
Qing Wang,
Mingshu Li:
Process Trustworthiness as a Capability Indicator for Measuring and Improving Software Trustworthiness.
ICSP 2009: 389-401 |
2008 |
32 | EE | Shujian Wu,
Qing Wang,
Ye Yang:
Quantitative analysis of faults and failures with multiple releases of softpm.
ESEM 2008: 198-205 |
31 | EE | Qi Li,
Qing Wang,
Ye Yang,
Mingshu Li:
Reducing biases in individual software effort estimations: a combining approach.
ESEM 2008: 223-232 |
30 | EE | Da Yang,
Qing Wang,
Mingshu Li,
Ye Yang,
Kai Ye,
Jing Du:
A survey on software cost estimation in the chinese software industry.
ESEM 2008: 253-262 |
29 | EE | Ye Yang,
Mei He,
Mingshu Li,
Qing Wang,
Barry W. Boehm:
Phase distribution of software development effort.
ESEM 2008: 61-69 |
28 | EE | Junchao Xiao,
Qing Wang,
Mingshu Li,
Ye Yang,
Fan Zhang,
Lizi Xie:
A constraint-driven human resource scheduling method in software development and maintenance process.
ICSM 2008: 17-26 |
27 | EE | Ye Yang,
Qi Li,
Mingshu Li,
Qing Wang:
An empirical analysis on distribution patterns of software maintenance effort.
ICSM 2008: 456-459 |
26 | EE | Yin Li,
Juan Li,
Ye Yang,
Mingshu Li:
Requirement-Centric Traceability for Change Impact Analysis: A Case Study.
ICSP 2008: 100-111 |
25 | EE | Shen Zhang,
Yongji Wang,
Ye Yang,
Junchao Xiao:
Capability Assessment of Individual Software Development Processes Using Software Repositories and DEA.
ICSP 2008: 147-159 |
24 | EE | Lang Gou,
Qing Wang,
Jun Yuan,
Ye Yang,
Mingshu Li,
Nan Jiang:
Quantitatively Managing Defects for Iterative Projects: An Industrial Experience Report in China.
ICSP 2008: 369-380 |
23 | EE | Mei He,
Mingshu Li,
Qing Wang,
Ye Yang,
Kai Ye:
An Investigation of Software Development Productivity in China.
ICSP 2008: 381-394 |
22 | EE | Fei Dong,
Mingshu Li,
Yuzhu Zhao,
Juan Li,
Ye Yang:
Software Multi-project Resource Scheduling: A Comparative Analysis.
ICSP 2008: 63-75 |
21 | EE | Thomas Tan,
Mei He,
Ye Yang,
Qing Wang,
Mingshu Li:
An Analysis to Understand Software Trustworthiness.
ICYCS 2008: 2366-2371 |
20 | EE | Zhiliang Zhu,
Jingping Song,
Aoshuang Dong,
Hai Yu,
Ye Yang:
Research and Analysis of Securities Market based on Multi-Fractal Generator.
ICYCS 2008: 2776-2781 |
2007 |
19 | EE | Mei He,
Ye Yang,
Qing Wang,
Mingshu Li:
Cost Estimation and Analysis for Government Contract Pricing in China.
ICSP 2007: 134-146 |
18 | EE | Da Yang,
Barry W. Boehm,
Ye Yang,
Qing Wang,
Mingshu Li:
Coping with the Cone of Uncertainty: An Empirical Study of the SAIV Process Model.
ICSP 2007: 37-48 |
17 | EE | Ye Yang,
Barry W. Boehm:
Improving process decisions in COTS-based development via risk-based prioritization.
Software Process: Improvement and Practice 12(5): 449-460 (2007) |
2006 |
16 | EE | Ye Yang,
Barry W. Boehm,
Dan Wu:
COCOTS Risk Analyzer.
ICCBSS 2006: 144-151 |
15 | EE | Ye Yang,
Barry W. Boehm,
Betsy Clark:
Assessing COTS integration risk using cost estimation inputs.
ICSE 2006: 431-438 |
14 | EE | Dan Wu,
Ye Yang:
Towards an Approach for Security Risk Analysis in COTS Based Development.
SPW/ProSim 2006: 124-131 |
13 | EE | Ye Yang,
Barry W. Boehm:
Optimizing Process Decision in COTS-Based Development Via Risk Based Prioritization.
SPW/ProSim 2006: 64-71 |
12 | EE | Hoh Peter In,
Jongmoon Baik,
Sangsoo Kim,
Ye Yang,
Barry W. Boehm:
A quality-based cost estimation model for the product line life cycle.
Commun. ACM 49(12): 85-88 (2006) |
2005 |
11 | EE | Barry W. Boehm,
Ye Yang,
Jesal Bhuta,
Daniel Port:
Composable Spiral Processes for COTS-Based Application Development.
ICCBSS 2005: 6-7 |
10 | EE | Ye Yang,
Barry W. Boehm:
A Contextualized Study of COTS-Based E-Service Projects.
ICCBSS 2005: 9 |
9 | EE | Xiaolang Yan,
Ying Qin,
Ye Yang,
Haitong Ge:
A high performance architecture of EBCOT encoder in JPEG 2000.
ISCAS (1) 2005: 492-495 |
8 | EE | Xing Qin,
Xiaolang Yan,
Haitong Ge,
Ye Yang:
A simplified algorithm of JPEG2000 rate control for VLSI implementation.
ISCAS (6) 2005: 6316-6319 |
7 | EE | Meng Huang,
Liguang Yang,
Ye Yang:
A Development Process for Building OSS-Based Applications.
ISPW 2005: 122-135 |
6 | EE | Ye Yang:
Process Patterns for COTS-Based Development.
ISPW 2005: 206-221 |
5 | EE | Ye Yang,
Jesal Bhuta,
Barry W. Boehm,
Daniel Noah Port:
Value-Based Processes for COTS-Based Applications.
IEEE Software 22(4): 54-62 (2005) |
2004 |
4 | EE | Daniel Port,
Ye Yang:
Empirical Analysis of COTS Activity Effort Sequences.
ICCBSS 2004: 169-182 |
3 | EE | Barry W. Boehm,
A. Winsor Brown,
Raymond J. Madachy,
Ye Yang:
A Software Product Line Life Cycle Cost Estimation Model.
ISESE 2004: 156-164 |
2003 |
2 | EE | Barry W. Boehm,
Daniel Port,
Ye Yang,
Jesal Bhuta:
Not All CBS Are Created Equally: COTS-Intensive Project Types.
ICCBSS 2003: 36-50 |
1 | EE | Barry W. Boehm,
Daniel Port,
Ye Yang,
Jesal Bhuta,
Chris Abts:
Composable Process Elements for Developing COTS-Based Applications.
ISESE 2003: 8-17 |