2009 | ||
---|---|---|
35 | EE | Qi Li, Mingshu Li, Ye Yang, Qing Wang, Thomas Tan, Barry W. Boehm, Chenyong Hu: Bridge the Gap between Software Test Process and Business Value: A Case Study. ICSP 2009: 212-223 |
34 | EE | Lei He, Juan Li, Qing Wang, Ye Yang: Predicting Upgrade Project Defects Based on Enhancement Requirements: An Empirical Study. ICSP 2009: 268-279 |
33 | EE | Ye Yang, Qing Wang, Mingshu Li: Process Trustworthiness as a Capability Indicator for Measuring and Improving Software Trustworthiness. ICSP 2009: 389-401 |
2008 | ||
32 | EE | Shujian Wu, Qing Wang, Ye Yang: Quantitative analysis of faults and failures with multiple releases of softpm. ESEM 2008: 198-205 |
31 | EE | Qi Li, Qing Wang, Ye Yang, Mingshu Li: Reducing biases in individual software effort estimations: a combining approach. ESEM 2008: 223-232 |
30 | EE | Da Yang, Qing Wang, Mingshu Li, Ye Yang, Kai Ye, Jing Du: A survey on software cost estimation in the chinese software industry. ESEM 2008: 253-262 |
29 | EE | Ye Yang, Mei He, Mingshu Li, Qing Wang, Barry W. Boehm: Phase distribution of software development effort. ESEM 2008: 61-69 |
28 | EE | Junchao Xiao, Qing Wang, Mingshu Li, Ye Yang, Fan Zhang, Lizi Xie: A constraint-driven human resource scheduling method in software development and maintenance process. ICSM 2008: 17-26 |
27 | EE | Ye Yang, Qi Li, Mingshu Li, Qing Wang: An empirical analysis on distribution patterns of software maintenance effort. ICSM 2008: 456-459 |
26 | EE | Yin Li, Juan Li, Ye Yang, Mingshu Li: Requirement-Centric Traceability for Change Impact Analysis: A Case Study. ICSP 2008: 100-111 |
25 | EE | Shen Zhang, Yongji Wang, Ye Yang, Junchao Xiao: Capability Assessment of Individual Software Development Processes Using Software Repositories and DEA. ICSP 2008: 147-159 |
24 | EE | Lang Gou, Qing Wang, Jun Yuan, Ye Yang, Mingshu Li, Nan Jiang: Quantitatively Managing Defects for Iterative Projects: An Industrial Experience Report in China. ICSP 2008: 369-380 |
23 | EE | Mei He, Mingshu Li, Qing Wang, Ye Yang, Kai Ye: An Investigation of Software Development Productivity in China. ICSP 2008: 381-394 |
22 | EE | Fei Dong, Mingshu Li, Yuzhu Zhao, Juan Li, Ye Yang: Software Multi-project Resource Scheduling: A Comparative Analysis. ICSP 2008: 63-75 |
21 | EE | Thomas Tan, Mei He, Ye Yang, Qing Wang, Mingshu Li: An Analysis to Understand Software Trustworthiness. ICYCS 2008: 2366-2371 |
20 | EE | Zhiliang Zhu, Jingping Song, Aoshuang Dong, Hai Yu, Ye Yang: Research and Analysis of Securities Market based on Multi-Fractal Generator. ICYCS 2008: 2776-2781 |
2007 | ||
19 | EE | Mei He, Ye Yang, Qing Wang, Mingshu Li: Cost Estimation and Analysis for Government Contract Pricing in China. ICSP 2007: 134-146 |
18 | EE | Da Yang, Barry W. Boehm, Ye Yang, Qing Wang, Mingshu Li: Coping with the Cone of Uncertainty: An Empirical Study of the SAIV Process Model. ICSP 2007: 37-48 |
17 | EE | Ye Yang, Barry W. Boehm: Improving process decisions in COTS-based development via risk-based prioritization. Software Process: Improvement and Practice 12(5): 449-460 (2007) |
2006 | ||
16 | EE | Ye Yang, Barry W. Boehm, Dan Wu: COCOTS Risk Analyzer. ICCBSS 2006: 144-151 |
15 | EE | Ye Yang, Barry W. Boehm, Betsy Clark: Assessing COTS integration risk using cost estimation inputs. ICSE 2006: 431-438 |
14 | EE | Dan Wu, Ye Yang: Towards an Approach for Security Risk Analysis in COTS Based Development. SPW/ProSim 2006: 124-131 |
13 | EE | Ye Yang, Barry W. Boehm: Optimizing Process Decision in COTS-Based Development Via Risk Based Prioritization. SPW/ProSim 2006: 64-71 |
12 | EE | Hoh Peter In, Jongmoon Baik, Sangsoo Kim, Ye Yang, Barry W. Boehm: A quality-based cost estimation model for the product line life cycle. Commun. ACM 49(12): 85-88 (2006) |
2005 | ||
11 | EE | Barry W. Boehm, Ye Yang, Jesal Bhuta, Daniel Port: Composable Spiral Processes for COTS-Based Application Development. ICCBSS 2005: 6-7 |
10 | EE | Ye Yang, Barry W. Boehm: A Contextualized Study of COTS-Based E-Service Projects. ICCBSS 2005: 9 |
9 | EE | Xiaolang Yan, Ying Qin, Ye Yang, Haitong Ge: A high performance architecture of EBCOT encoder in JPEG 2000. ISCAS (1) 2005: 492-495 |
8 | EE | Xing Qin, Xiaolang Yan, Haitong Ge, Ye Yang: A simplified algorithm of JPEG2000 rate control for VLSI implementation. ISCAS (6) 2005: 6316-6319 |
7 | EE | Meng Huang, Liguang Yang, Ye Yang: A Development Process for Building OSS-Based Applications. ISPW 2005: 122-135 |
6 | EE | Ye Yang: Process Patterns for COTS-Based Development. ISPW 2005: 206-221 |
5 | EE | Ye Yang, Jesal Bhuta, Barry W. Boehm, Daniel Noah Port: Value-Based Processes for COTS-Based Applications. IEEE Software 22(4): 54-62 (2005) |
2004 | ||
4 | EE | Daniel Port, Ye Yang: Empirical Analysis of COTS Activity Effort Sequences. ICCBSS 2004: 169-182 |
3 | EE | Barry W. Boehm, A. Winsor Brown, Raymond J. Madachy, Ye Yang: A Software Product Line Life Cycle Cost Estimation Model. ISESE 2004: 156-164 |
2003 | ||
2 | EE | Barry W. Boehm, Daniel Port, Ye Yang, Jesal Bhuta: Not All CBS Are Created Equally: COTS-Intensive Project Types. ICCBSS 2003: 36-50 |
1 | EE | Barry W. Boehm, Daniel Port, Ye Yang, Jesal Bhuta, Chris Abts: Composable Process Elements for Developing COTS-Based Applications. ISESE 2003: 8-17 |