2009 |
59 | EE | Jian Zhai,
Qiusong Yang,
Feng Su,
Junchao Xiao,
Qing Wang,
Mingshu Li:
Stochastic Process Algebra Based Software Process Simulation Modeling.
ICSP 2009: 136-147 |
58 | EE | Qi Li,
Mingshu Li,
Ye Yang,
Qing Wang,
Thomas Tan,
Barry W. Boehm,
Chenyong Hu:
Bridge the Gap between Software Test Process and Business Value: A Case Study.
ICSP 2009: 212-223 |
57 | EE | Xiao Liu,
Yun Yang,
Jinjun Chen,
Qing Wang,
Mingshu Li:
Achieving On-Time Delivery: A Two-Stage Probabilistic Scheduling Strategy for Software Projects.
ICSP 2009: 317-329 |
56 | EE | Ye Yang,
Qing Wang,
Mingshu Li:
Process Trustworthiness as a Capability Indicator for Measuring and Improving Software Trustworthiness.
ICSP 2009: 389-401 |
55 | EE | Junchao Xiao,
Qing Wang,
Mingshu Li,
Qiusong Yang,
Lizi Xie,
Dapeng Liu:
Value-Based Multiple Software Projects Scheduling with Genetic Algorithm.
ICSP 2009: 50-62 |
2008 |
54 | EE | Qi Li,
Qing Wang,
Ye Yang,
Mingshu Li:
Reducing biases in individual software effort estimations: a combining approach.
ESEM 2008: 223-232 |
53 | EE | Da Yang,
Qing Wang,
Mingshu Li,
Ye Yang,
Kai Ye,
Jing Du:
A survey on software cost estimation in the chinese software industry.
ESEM 2008: 253-262 |
52 | EE | Ye Yang,
Mei He,
Mingshu Li,
Qing Wang,
Barry W. Boehm:
Phase distribution of software development effort.
ESEM 2008: 61-69 |
51 | EE | Junchao Xiao,
Qing Wang,
Mingshu Li,
Ye Yang,
Fan Zhang,
Lizi Xie:
A constraint-driven human resource scheduling method in software development and maintenance process.
ICSM 2008: 17-26 |
50 | EE | Ye Yang,
Qi Li,
Mingshu Li,
Qing Wang:
An empirical analysis on distribution patterns of software maintenance effort.
ICSM 2008: 456-459 |
49 | EE | Mingshu Li:
An integrated solution for software process improvement.
ICSM 2008: 472-473 |
48 | EE | Yin Li,
Juan Li,
Ye Yang,
Mingshu Li:
Requirement-Centric Traceability for Change Impact Analysis: A Case Study.
ICSP 2008: 100-111 |
47 | EE | Lang Gou,
Qing Wang,
Jun Yuan,
Ye Yang,
Mingshu Li,
Nan Jiang:
Quantitatively Managing Defects for Iterative Projects: An Industrial Experience Report in China.
ICSP 2008: 369-380 |
46 | EE | Mei He,
Mingshu Li,
Qing Wang,
Ye Yang,
Kai Ye:
An Investigation of Software Development Productivity in China.
ICSP 2008: 381-394 |
45 | EE | Fei Dong,
Mingshu Li,
Yuzhu Zhao,
Juan Li,
Ye Yang:
Software Multi-project Resource Scheduling: A Comparative Analysis.
ICSP 2008: 63-75 |
44 | EE | Thomas Tan,
Mei He,
Ye Yang,
Qing Wang,
Mingshu Li:
An Analysis to Understand Software Trustworthiness.
ICYCS 2008: 2366-2371 |
43 | | Jian Dai,
Junchao Xiao,
Qing Wang,
Mingshu Li,
Huaizhang Li:
Dynamically Optimize Process Execution Based on Process-agent.
SEKE 2008: 561-564 |
42 | EE | Nao Li,
Mingshu Li,
Qing Wang,
Shuanzhu Du:
A flexible negotiation model for an agent-based software process modelling.
IJCAT 31(1/2): 64-73 (2008) |
41 | EE | Shujuan Lü,
Mingshu Li:
Modified Legendre rational spectral method for the Burgers equation on the half-line.
Int. J. Comput. Math. 85(6): 865-875 (2008) |
40 | EE | Qing Wang,
Lang Gou,
Nan Jiang,
Meiru Che,
Ronghui Zhang,
Yun Yang,
Mingshu Li:
Estimating fixing effort and schedule based on defect injection distribution.
Software Process: Improvement and Practice 13(1): 35-50 (2008) |
2007 |
39 | EE | Juan Li,
Nan Jiang,
Mingshu Li,
Qing Wang,
Yanwu Yang:
Tracking Projects through A Three-Dimensional Software Development Model.
COMPSAC (1) 2007: 301-308 |
38 | EE | Qiusong Yang,
Mingshu Li,
Qing Wang,
Guowei Yang,
Jian Zhai,
Juan Li,
Lishan Hou,
Yun Yang:
An Algebraic Approach for Managing Inconsistencies in Software Processes, .
ICSP 2007: 121-133 |
37 | EE | Mei He,
Ye Yang,
Qing Wang,
Mingshu Li:
Cost Estimation and Analysis for Government Contract Pricing in China.
ICSP 2007: 134-146 |
36 | EE | Nao Li,
Qing Wang,
Mingshu Li,
Shuanzhu Du,
Junchao Xiao:
A Multilateral Negotiation Method for Software Process Modeling.
ICSP 2007: 147-158 |
35 | EE | Li Ruan,
Yongji Wang,
Qing Wang,
Mingshu Li,
Yun Yang,
Lizi Xie,
Dapeng Liu,
Haitao Zeng,
Shen Zhang,
Junchao Xiao,
Lei Zhang,
M. Wasif Nisar,
Jian Dai:
Empirical Study on Benchmarking Software Development Tasks.
ICSP 2007: 221-232 |
34 | EE | Qing Wang,
Lang Gou,
Nan Jiang,
Meiru Che,
Ronghui Zhang,
Yun Yang,
Mingshu Li:
An Empirical Study on Establishing Quantitative Management Model for Testing Process.
ICSP 2007: 233-245 |
33 | EE | Da Yang,
Barry W. Boehm,
Ye Yang,
Qing Wang,
Mingshu Li:
Coping with the Cone of Uncertainty: An Empirical Study of the SAIV Process Model.
ICSP 2007: 37-48 |
32 | EE | Lei Zhang,
Qing Wang,
Junchao Xiao,
Li Ruan,
Lizi Xie,
Mingshu Li:
A Tool to Create Process-Agents for OEC-SPM from Historical Project Data.
ICSP 2007: 84-95 |
31 | EE | Mingshu Li:
TRISO-Model: A New Approach to Integrated Software Process Assessment and Improvement.
Software Process: Improvement and Practice 12(5): 387-398 (2007) |
2006 |
30 | EE | Mingshu Li,
Meng Huang,
Fengdi Shu,
Juan Li:
A risk-driven method for eXtreme programming release planning.
ICSE 2006: 423-430 |
29 | EE | Qing Wang,
Nan Jiang,
Lang Gou,
Xia Liu,
Mingshu Li,
Yongji Wang:
BSR: a statistic-based approach for establishing and refining software process performance baseline.
ICSE 2006: 585-594 |
28 | | Nao Li,
Mingshu Li,
Qing Wang,
Shuanzhu Du:
A Negotiation Model for the Process Agents in an Agent-Based Process-Centered Software Engineering Environment.
SEKE 2006: 664-669 |
27 | EE | Mingshu Li,
Qiusong Yang,
Jian Zhai,
Guowei Yang:
On Mobility of Software Processes.
SPW/ProSim 2006: 105-114 |
26 | EE | Da Yang,
Yuxiang Wan,
Zinan Tang,
Shujian Wu,
Mei He,
Mingshu Li:
COCOMO-U: An Extension of COCOMO II for Cost Estimation with Uncertainty.
SPW/ProSim 2006: 132-141 |
25 | EE | Mingshu Li:
Assessing 3-D Integrated Software Development Processes: A New Benchmark.
SPW/ProSim 2006: 15-38 |
24 | EE | Qing Wang,
Junchao Xiao,
Mingshu Li,
M. Wasif Nisar,
Rong Yuan,
Lei Zhang:
A Process-Agent Construction Method for Software Process Modeling in SoftPM.
SPW/ProSim 2006: 204-213 |
23 | | Feng Yuan,
Mingshu Li,
Zhigang Wan:
SEM2XPDL: Towards SPEM Model Enactment.
Software Engineering Research and Practice 2006: 240-245 |
2005 |
22 | | Mingshu Li,
Barry W. Boehm,
Leon J. Osterweil:
Unifying the Software Process Spectrum, International Software Process Workshop, SPW 2005, Beijing, China, May 25-27, 2005, Revised Selected Papers
Springer 2005 |
21 | EE | Qing Wang,
Mingshu Li:
Measuring and improving software process in China.
ISESE 2005: 183-192 |
20 | EE | Qing Wang,
Mingshu Li:
Software Process Management: Practices in China.
ISPW 2005: 317-331 |
19 | EE | Zhanchun Wu,
David Christensen,
Mingshu Li,
Qing Wang:
A Survey of CMM/CMMI Implementation in China.
ISPW 2005: 507-520 |
18 | EE | Mingshu Li:
Expanding the Horizons of Software Development Processes: A 3-D Integrated Methodology.
ISPW 2005: 54-67 |
17 | EE | Xinpei Zhao,
Keith Chan,
Mingshu Li:
Applying agent technology to software process modeling and process-centered software engineering environment.
SAC 2005: 1529-1533 |
2004 |
16 | | Han Liu,
Chao Li,
Jizhe Wang,
Qing Wang,
Mingshu Li:
A User-Oriented Model-Driven Requirements Elicitation Process based on User Modeling.
Computer Supported Acitivity Coordination 2004: 174-184 |
15 | EE | Yuan Liao,
Mingshu Li:
A QoS-aware Component-Based Middleware for Pervasive Computing.
ICESS 2004: 229-235 |
14 | EE | Wen-Jie Li,
Mingshu Li,
Qing Wang,
Yongji Wang:
VICOS: A Framework for Session Management in Network Computing Infrastructure.
IEEE SCC 2004: 647-650 |
13 | EE | Juan Li,
Mingshu Li,
Zhanchun Wu,
Qing Wang:
A Metamodel for the CMM Software Process.
ISPA 2004: 446-450 |
12 | | John Sum,
Mingshu Li,
Chung W. Ng,
Tony Wong,
Gilbert H. Young:
A Study of the Connectedness of Gnutella.
PDPTA 2004: 960-966 |
11 | EE | Ying Dong,
Mingshu Li:
HyO-XTM: a set of hyper-graph operations on XML Topic Map toward knowledge management.
Future Generation Comp. Syst. 20(1): 81-100 (2004) |
10 | EE | Ying Dong,
Mingshu Li:
Mobile communications in China.
IJMC 2(4): 395-404 (2004) |
9 | EE | Yongji Wang,
Liu Han,
Mingshu Li,
Qing Wang,
Jinhui Zhou,
Matthew Cartmel:
A real-time path planning approach without the computation of Cspace obstacles.
Robotica 22(2): 173-187 (2004) |
2003 |
8 | | Chao Li,
Han Liu,
Jizhe Wang,
Qing Wang,
Mingshu Li:
A Context-Aware User-Adaptive Supporting System for Goal-Oriented Requirements Elicitation Process.
ICEIS (3) 2003: 347-356 |
2002 |
7 | EE | Ying Dong,
Mingshu Li:
TEMPPLET: A New Method for Domain-Specific Ontology Design.
EDCIS 2002: 90-103 |
6 | EE | Guoqiang Shu,
Chao Li,
Qing Wang,
Mingshu Li:
Validating Objected-Oriented Prototype of Real-Time Systems with Timed Automata.
IEEE International Workshop on Rapid System Prototyping 2002: 99- |
5 | EE | Ying Dong,
John Hallam,
Mingshu Li:
On Constructing a Cooperative Paradigm.
Applied Artificial Intelligence 16(3): 209-241 (2002) |
2001 |
4 | EE | Ying Dong,
Mingshu Li:
A Risk-Driven Design Model for Embedded System.
APAQS 2001: 204-210 |
3 | EE | Chao Li,
Han Li,
Mingshu Li:
A Software Factory Model Based on ISO9000 and CMM for Chinese Small Organizations.
APAQS 2001: 288-294 |
2 | EE | Minzhe Zhao,
Mingshu Li:
T.120/H.32x-based Multimedia Conferencing Desig.
CSCWD 2001: 146-148 |
1999 |
1 | EE | Mei Lu,
Xinpei Zhao,
Mingshu Li:
Object-Oriented Requirements Modeling Based on UML.
TOOLS (31) 1999: 133- |