2008 |
21 | EE | Appa Iyer Sivakumar,
Chao Qi,
Andy Darwin Kasan Hidayat:
Experimental study on variations of WIPLOAD Control in semiconductor wafer fabrication environment.
Winter Simulation Conference 2008: 2035-2040 |
20 | EE | John Benedict C. Tajan,
Appa Iyer Sivakumar,
Stanley B. Gershwin:
Online control of a batch processor with incompatible job families under correlated future arrivals.
Winter Simulation Conference 2008: 2100-2108 |
19 | EE | Amit Kumar Gupta,
Peter Lendermann,
Appa Iyer Sivakumar,
John Priyadi:
Simulation analysis of cluster tool operations in wafer fabrication.
Winter Simulation Conference 2008: 2141-2147 |
18 | EE | Kunpeng Li,
Appa Iyer Sivakumar,
Viswanath Kumar Ganesan:
Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain.
European Journal of Operational Research 187(2): 442-455 (2008) |
2007 |
17 | EE | Chao Qi,
Appa Iyer Sivakumar,
Stanley B. Gershwin:
Simulation experimental investigation on job release control in semiconductor wafer fabrication.
Winter Simulation Conference 2007: 1737-1746 |
16 | EE | Adeline T. H. Ang,
Appa Iyer Sivakumar:
Online multiobjective single machine dynamic scheduling with sequence-dependent setups using simulation-based genetic algorithm with desirability function.
Winter Simulation Conference 2007: 1828-1834 |
2006 |
15 | EE | Amit Kumar Gupta,
Appa Iyer Sivakumar:
Pareto control in multi-objective dynamic scheduling of a stepper machine in semiconductor wafer fabrication.
Winter Simulation Conference 2006: 1749-1756 |
14 | EE | Chin Soon Chong,
Appa Iyer Sivakumar,
Malcolm Yoke-Hean Low,
Kheng Leng Gay:
A bee colony optimization algorithm to job shop scheduling.
Winter Simulation Conference 2006: 1954-1961 |
13 | EE | Viswanath Kumar Ganesan,
Appa Iyer Sivakumar,
G. Srinivasan:
Hierarchical minimization of completion time variance and makespan in jobshops.
Computers & OR 33: 1345-1367 (2006) |
2005 |
12 | EE | Chin Soon Chong,
Malcolm Yoke-Hean Low,
Appa Iyer Sivakumar,
Kheng Leng Gay:
Using simulation based approach to improve on the mean cycle time performance of dispatching rules.
Winter Simulation Conference 2005: 2194-2202 |
2004 |
11 | EE | Viswanath Kumar Ganesan,
Amit Kumar Gupta,
Appa Iyer Sivakumar:
Bi-objective schedule control of batch processes in semiconductor manufacturing.
RAM 2004: 1077-1082 |
10 | EE | Amit Kumar Gupta,
Appa Iyer Sivakumar,
Viswanath Kumar Ganesan:
Look ahead batching to minimize earliness/tardiness measures in batch processes.
RAM 2004: 1101-1106 |
2003 |
9 | EE | Chin Soon Chong,
Appa Iyer Sivakumar,
Robert K. L. Gay:
Factory scheduling: simulation based scheduling using a two-pass approach.
Winter Simulation Conference 2003: 1433-1439 |
8 | EE | Chin Soon Chong,
Appa Iyer Sivakumar,
Robert K. L. Gay:
Dynamic scheduling I: simulation-based scheduling for dynamic discrete manufacturing.
Winter Simulation Conference 2003: 1465-1473 |
2002 |
7 | EE | Chao Qi,
Tuck Keat Tang,
Appa Iyer Sivakumar:
Modeling methodology: simulation based cause and effect analysis of cycle time and WIP in semiconductor wafer fabrication.
Winter Simulation Conference 2002: 1423-1430 |
6 | EE | Chin Soon Chong,
Appa Iyer Sivakumar,
Robert K. L. Gay:
Semiconductor manufacturing: design, development and application of an object oriented simulation toolkit for real-time semiconductor manufacturing scheduling.
Winter Simulation Conference 2002: 1849-1856 |
5 | EE | Amit K. Gupta II,
Appa Iyer Sivakumar:
Semiconductor manufacturing: simulation based multiobjective schedule optimization in semiconductor manufacturing.
Winter Simulation Conference 2002: 1862-1870 |
4 | EE | Amit K. Gupta II,
Appa Iyer Sivakumar,
Sumit Sarawgi:
Scheduling & control: shop floor scheduling with simulation based proactive decision support.
Winter Simulation Conference 2002: 1897-1902 |
2000 |
3 | EE | Appa Iyer Sivakumar,
Chin Soon Chong:
Development of an Object Oriented Simulation Engine for On-Line Simulation and Optimization.
Annual Simulation Symposium 2000: 291-298 |
2 | EE | Appa Iyer Sivakumar:
Simulation based cause and effect analysis of cycle time distribution in semiconductor backend.
Winter Simulation Conference 2000: 1464-1471 |
1999 |
1 | EE | Appa Iyer Sivakumar:
Optimization of a cycle time and utilization in semiconductor test manufacturing using simulation based, on-line, near-real-time scheduling system.
Winter Simulation Conference 1999: 727-735 |