2008 |
8 | EE | John Benedict C. Tajan,
Appa Iyer Sivakumar,
Stanley B. Gershwin:
Online control of a batch processor with incompatible job families under correlated future arrivals.
Winter Simulation Conference 2008: 2100-2108 |
2007 |
7 | EE | Chao Qi,
Appa Iyer Sivakumar,
Stanley B. Gershwin:
Simulation experimental investigation on job release control in semiconductor wafer fabrication.
Winter Simulation Conference 2007: 1737-1746 |
2004 |
6 | EE | George Liberopoulos,
Baris Tan,
Stanley B. Gershwin,
C. T. Papadopoulos,
James MacGregor Smith:
Preface.
Annals OR 125(1-4): 17-19 (2004) |
5 | EE | Baris Tan,
Stanley B. Gershwin:
Production and Subcontracting Strategies for Manufacturers with Limited Capacity and Volatile Demand.
Annals OR 125(1-4): 205-232 (2004) |
4 | EE | George Liberopoulos,
Baris Tan,
Stanley B. Gershwin,
C. T. Papadopoulos,
James MacGregor Smith:
Preface.
Annals OR 126(1-4): 17-19 (2004) |
1992 |
3 | EE | Yves Dallery,
Stanley B. Gershwin:
Manufacturing flow line systems: a review of models and analytical results.
Queueing Syst. 12(1-2): 3-94 (1992) |
1989 |
2 | | Mostafa H. Ammar,
Stanley B. Gershwin:
Equivalence Relations in Queueing Models of Fork/Join Networks with Blocking.
Perform. Eval. 10(3): 233-245 (1989) |
1985 |
1 | | Stanley B. Gershwin,
Ramakrishna Akella,
Yong F. Choong:
Short-Term Production Scheduling of an Automated Manufacturing Facility.
IBM Journal of Research and Development 29(4): 392-400 (1985) |