![]() |
| 2008 | ||
|---|---|---|
| 4 | EE | Kunpeng Li, Appa Iyer Sivakumar, Viswanath Kumar Ganesan: Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain. European Journal of Operational Research 187(2): 442-455 (2008) |
| 2006 | ||
| 3 | EE | Viswanath Kumar Ganesan, Appa Iyer Sivakumar, G. Srinivasan: Hierarchical minimization of completion time variance and makespan in jobshops. Computers & OR 33: 1345-1367 (2006) |
| 2004 | ||
| 2 | EE | Viswanath Kumar Ganesan, Amit Kumar Gupta, Appa Iyer Sivakumar: Bi-objective schedule control of batch processes in semiconductor manufacturing. RAM 2004: 1077-1082 |
| 1 | EE | Amit Kumar Gupta, Appa Iyer Sivakumar, Viswanath Kumar Ganesan: Look ahead batching to minimize earliness/tardiness measures in batch processes. RAM 2004: 1101-1106 |
| 1 | Amit Kumar Gupta | [1] [2] |
| 2 | Kunpeng Li | [4] |
| 3 | Appa Iyer Sivakumar | [1] [2] [3] [4] |
| 4 | G. Srinivasan | [3] |