2008 | ||
---|---|---|
7 | EE | Yang Liu, Jingshan Li: Modeling and analysis of Bernoulli production systems with split and merge. ICRA 2008: 3618-3623 |
2007 | ||
6 | EE | Jingshan Li, Ningjian Huang: Quality Evaluation in Flexible Machining Systems: A Flexible Fixture Case Study. ICRA 2007: 686-691 |
2006 | ||
5 | Jingshan Li, Dennis Blumenfeld, Samuel P. Marin: Quality Robustness Design of Manufacturing Systems with Repair and Rework. ICRA 2006: 1060-1065 | |
2005 | ||
4 | Jingshan Li, Dennis Blumenfeld: Analysis of Andon Type Transfer Production Lines: A Quantitative Approach. ICRA 2005: 278-283 | |
2004 | ||
3 | EE | Jingshan Li, Ningjian Huang: Modeling and Analysis of a Multiple Product Manufacturing System with Split and Merge. ICRA 2004: 2261-2266 |
2 | EE | Jingshan Li, Emre Enginarlar, Semyon M. Meerkov: Random Demand Satisfaction in Unreliable Production-Inventory-Customer Systems. Annals OR 126(1-4): 159-175 (2004) |
2000 | ||
1 | Jingshan Li, Semyon M. Meerkov: Bottlenecks with Respect to Due-Time Performance in Pull Serial Production Lines. ICRA 2000: 2635-2640 |
1 | Dennis Blumenfeld | [4] [5] |
2 | Emre Enginarlar | [2] |
3 | Ningjian Huang | [3] [6] |
4 | Yang Liu | [7] |
5 | Samuel P. Marin | [5] |
6 | Semyon M. Meerkov | [1] [2] |