2008 |
10 | EE | Wladyslaw A. Janiak,
Adam Janiak,
Marie-Claude Portmann:
Single machine scheduling with job ready and delivery times subject to resource constraints.
IPDPS 2008: 1-7 |
9 | EE | Ammar Oulamara,
Marie-Claude Portmann:
Project management and scheduling.
European Journal of Operational Research 189(3): 1133-1135 (2008) |
2006 |
8 | EE | Julien Fondrevelle,
Ammar Oulamara,
Marie-Claude Portmann:
Permutation flowshop scheduling problems with maximal and minimal time lags.
Computers & OR 33: 1540-1556 (2006) |
7 | EE | Yuri N. Sotskov,
Alexandre Dolgui,
Marie-Claude Portmann:
Stability analysis of an optimal balance for an assembly line with fixed cycle time.
European Journal of Operational Research 168(3): 783-797 (2006) |
6 | EE | Latifa Ouzizi,
Didier Anciaux,
Marie-Claude Portmann,
François Vernadat:
A model for cooperative planning within a virtual enterprise.
Int. J. Computer Integrated Manufacturing 19(3): 197-209 (2006) |
5 | EE | Mikhail Y. Kovalyov,
Marie-Claude Portmann,
Ammar Oulamara:
Optimal testing and repairing a failed series system.
J. Comb. Optim. 12(3): 279-295 (2006) |
2005 |
4 | EE | Julien Fondrevelle,
Ammar Oulamara,
Marie-Claude Portmann:
Minimizing makespan in flowshop with time lags
CoRR abs/cs/0507016: (2005) |
3 | EE | Adam Janiak,
Mikhail Y. Kovalyov,
Marie-Claude Portmann:
Single machine group scheduling with resource dependent setup and processing times.
European Journal of Operational Research 162(1): 112-121 (2005) |
2004 |
2 | EE | Mohamed Ali Aloulou,
Mikhail Y. Kovalyov,
Marie-Claude Portmann:
Maximization Problems in Single Machine Scheduling.
Annals OR 129(1-4): 21-32 (2004) |
2000 |
1 | | Marie-Claude Portmann,
Antony Vignier:
Performances's study on crossover operators keeping good schemata for some scheduling problems.
GECCO 2000: 331-338 |