2008 | ||
---|---|---|
6 | EE | Ammar Oulamara, Marie-Claude Portmann: Project management and scheduling. European Journal of Operational Research 189(3): 1133-1135 (2008) |
2007 | ||
5 | EE | Ammar Oulamara: Makespan minimization in a no-wait flow shop problem with two batching machines. Computers & OR 34(4): 1033-1050 (2007) |
2006 | ||
4 | EE | Julien Fondrevelle, Ammar Oulamara, Marie-Claude Portmann: Permutation flowshop scheduling problems with maximal and minimal time lags. Computers & OR 33: 1540-1556 (2006) |
3 | EE | Mikhail Y. Kovalyov, Marie-Claude Portmann, Ammar Oulamara: Optimal testing and repairing a failed series system. J. Comb. Optim. 12(3): 279-295 (2006) |
2005 | ||
2 | EE | Julien Fondrevelle, Ammar Oulamara, Marie-Claude Portmann: Minimizing makespan in flowshop with time lags CoRR abs/cs/0507016: (2005) |
1 | EE | Ameur Soukhal, Ammar Oulamara, P. Martineau: Complexity of flow shop scheduling problems with transportation constraints. European Journal of Operational Research 161(1): 32-41 (2005) |
1 | Julien Fondrevelle | [2] [4] |
2 | Mikhail Y. Kovalyov | [3] |
3 | P. Martineau | [1] |
4 | Marie-Claude Portmann | [2] [3] [4] [6] |
5 | Ameur Soukhal | [1] |