2006 | ||
---|---|---|
3 | EE | Ji-Bo Wang, C. T. Daniel Ng, T. C. Edwin Cheng, Li-Li Liu: Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Applied Mathematics and Computation 180(1): 185-193 (2006) |
2004 | ||
2 | EE | C. T. Daniel Ng, T. C. Edwin Cheng, Mikhail Y. Kovalyov: Single machine batch scheduling with jointly compressible setup and processing times. European Journal of Operational Research 153(1): 211-219 (2004) |
2003 | ||
1 | EE | C. T. Daniel Ng, T. C. Edwin Cheng, Mikhail Y. Kovalyov, S. S. Lam: Single machine scheduling with a variable common due date and resource-dependent processing times. Computers & OR 30(8): 1173-1185 (2003) |
1 | T. C. Edwin Cheng | [1] [2] [3] |
2 | Mikhail Y. Kovalyov | [1] [2] |
3 | S. S. Lam | [1] |
4 | Li-Li Liu | [3] |
5 | Ji-Bo Wang | [3] |