2009 |
25 | EE | Gerd Finke,
Vitaly A. Strusevich,
Frank Werner:
Guest Editorial.
Computers & OR 36(2): 299-300 (2009) |
24 | EE | Jitti Jungwattanakit,
Manop Reodecha,
Paveena Chaovalitwongse,
Frank Werner:
A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria.
Computers & OR 36(2): 358-378 (2009) |
2008 |
23 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date.
Computers & OR 35(2): 574-599 (2008) |
22 | EE | Valery S. Gordon,
Yury L. Orlovich,
Frank Werner:
Hamiltonian properties of triangular grid graphs.
Discrete Mathematics 308(24): 6166-6188 (2008) |
21 | EE | Heidemarie Bräsel,
André Herms,
Marc Mörig,
Thomas Tautenhahn,
Jan Tusch,
Frank Werner:
Heuristic constructive algorithms for open shop scheduling to minimize mean flow time.
European Journal of Operational Research 189(3): 856-870 (2008) |
2007 |
20 | EE | Mikhail Y. Kovalyov,
Frank Werner:
Problem F.
European Journal of Operational Research 177(2): 1310-1311 (2007) |
19 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
A note on the two machine job shop with the weighted late work criterion.
J. Scheduling 10(2): 87-95 (2007) |
2006 |
18 | EE | Karl Inderfurth,
Adam Janiak,
Mikhail Y. Kovalyov,
Frank Werner:
Batching work and rework processes with limited deterioration of reworkables.
Computers & OR 33: 1595-1605 (2006) |
17 | EE | Frank Werner:
V. T'Kindt and J.C. Billaut, Multicriteria Scheduling. Theory, Models and Algorithms, Springer Verlag (2002) ISBN 3-540-43617-0.
European Journal of Operational Research 168(1): 275-277 (2006) |
2005 |
16 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
Metaheuristics for Late Work Minimization in Two-Machine Flow Shop with Common Due Date.
KI 2005: 222-234 |
15 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
The two-machine flow-shop problem with weighted late work criterion and common due date.
European Journal of Operational Research 165(2): 408-415 (2005) |
14 | EE | Adam Janiak,
Mikhail Y. Kovalyov,
Wieslaw Kubiak,
Frank Werner:
Positive half-products and scheduling with controllable processing times.
European Journal of Operational Research 165(2): 416-422 (2005) |
2004 |
13 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
Flow Shop Scheduling with Late Work Criterion - Choosing the Best Solution Strategy.
AACC 2004: 68-75 |
12 | EE | Volker Lauff,
Frank Werner:
On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties.
Computers & OR 31(3): 317-345 (2004) |
11 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
Open shop scheduling problems with late work criteria.
Discrete Applied Mathematics 134(1-3): 1-24 (2004) |
10 | EE | Tsung-Chyan Lai,
Yuri N. Sotskov,
Nadezhda Sotskova,
Frank Werner:
Mean flow time minimization with given bounds of processing times.
European Journal of Operational Research 159(3): 558-573 (2004) |
2002 |
9 | EE | Jatinder N. D. Gupta,
Karin Krüger,
Volker Lauff,
Frank Werner,
Yuri N. Sotskov:
Heuristics for hybrid flow shops with controllable processing times and assignable due dates.
Computers & OR 29(10): 1417-1439 (2002) |
8 | EE | Jatinder N. D. Gupta,
Karsten Hennig,
Frank Werner:
Local search heuristics for two-stage flow shop problems with secondary criterion.
Computers & OR 29(2): 123-149 (2002) |
7 | | Mikhail Y. Kovalyov,
Frank Werner:
Approximation Schemes for Scheduling Jobs with Common Due Date on Parallel Machines to Minimize Total Tardiness.
J. Heuristics 8(4): 415-428 (2002) |
2001 |
6 | EE | Svetlana A. Kravchenko,
Frank Werner:
A heuristic algorithm for minimizing mean flow time with unit setups.
Inf. Process. Lett. 79(6): 291-296 (2001) |
1997 |
5 | EE | Peter Brucker,
Johann Hurink,
Frank Werner:
Improving Local Search Heuristics for some Scheduling Problems. Part II.
Discrete Applied Mathematics 72(1-2): 47-69 (1997) |
1996 |
4 | EE | Peter Brucker,
Johann Hurink,
Frank Werner:
Improving Local Search Heuristics for Some Scheduling Problems-I.
Discrete Applied Mathematics 65(1-3): 97-122 (1996) |
1995 |
3 | EE | Frank Werner,
Andreas Winkler:
Insertion Techniques for the Heuristic Solution of the Job Shop Problem.
Discrete Applied Mathematics 58(2): 191-211 (1995) |
2 | EE | Heidemarie Bräsel,
David Kluge,
Frank Werner:
A Polynomial Algorithm for an open Shop Problem with Unit Processing Times and Tree Constraints.
Discrete Applied Mathematics 59(1): 11-21 (1995) |
1993 |
1 | EE | Frank Werner:
On the heuristic solution of the permutation flow shop problem by path algorithms.
Computers & OR 20(7): 707-722 (1993) |