dblp.uni-trier.dewww.uni-trier.de

Frank Werner

List of publications from the DBLP Bibliography Server - FAQ
Coauthor Index - Ask others: ACM DL/Guide - CiteSeer - CSB - Google - MSN - Yahoo

2009
25EEGerd Finke, Vitaly A. Strusevich, Frank Werner: Guest Editorial. Computers & OR 36(2): 299-300 (2009)
24EEJitti Jungwattanakit, Manop Reodecha, Paveena Chaovalitwongse, Frank Werner: A comparison of scheduling algorithms for flexible flow shop problems with unrelated parallel machines, setup times, and dual criteria. Computers & OR 36(2): 358-378 (2009)
2008
23EEJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner: Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date. Computers & OR 35(2): 574-599 (2008)
22EEValery S. Gordon, Yury L. Orlovich, Frank Werner: Hamiltonian properties of triangular grid graphs. Discrete Mathematics 308(24): 6166-6188 (2008)
21EEHeidemarie Bräsel, André Herms, Marc Mörig, Thomas Tautenhahn, Jan Tusch, Frank Werner: Heuristic constructive algorithms for open shop scheduling to minimize mean flow time. European Journal of Operational Research 189(3): 856-870 (2008)
2007
20EEMikhail Y. Kovalyov, Frank Werner: Problem F. European Journal of Operational Research 177(2): 1310-1311 (2007)
19EEJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner: A note on the two machine job shop with the weighted late work criterion. J. Scheduling 10(2): 87-95 (2007)
2006
18EEKarl Inderfurth, Adam Janiak, Mikhail Y. Kovalyov, Frank Werner: Batching work and rework processes with limited deterioration of reworkables. Computers & OR 33: 1595-1605 (2006)
17EEFrank Werner: V. T'Kindt and J.C. Billaut, Multicriteria Scheduling. Theory, Models and Algorithms, Springer Verlag (2002) ISBN 3-540-43617-0. European Journal of Operational Research 168(1): 275-277 (2006)
2005
16EEJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner: Metaheuristics for Late Work Minimization in Two-Machine Flow Shop with Common Due Date. KI 2005: 222-234
15EEJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner: The two-machine flow-shop problem with weighted late work criterion and common due date. European Journal of Operational Research 165(2): 408-415 (2005)
14EEAdam Janiak, Mikhail Y. Kovalyov, Wieslaw Kubiak, Frank Werner: Positive half-products and scheduling with controllable processing times. European Journal of Operational Research 165(2): 416-422 (2005)
2004
13EEJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner: Flow Shop Scheduling with Late Work Criterion - Choosing the Best Solution Strategy. AACC 2004: 68-75
12EEVolker Lauff, Frank Werner: On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties. Computers & OR 31(3): 317-345 (2004)
11EEJacek Blazewicz, Erwin Pesch, Malgorzata Sterna, Frank Werner: Open shop scheduling problems with late work criteria. Discrete Applied Mathematics 134(1-3): 1-24 (2004)
10EETsung-Chyan Lai, Yuri N. Sotskov, Nadezhda Sotskova, Frank Werner: Mean flow time minimization with given bounds of processing times. European Journal of Operational Research 159(3): 558-573 (2004)
2002
9EEJatinder N. D. Gupta, Karin Krüger, Volker Lauff, Frank Werner, Yuri N. Sotskov: Heuristics for hybrid flow shops with controllable processing times and assignable due dates. Computers & OR 29(10): 1417-1439 (2002)
8EEJatinder N. D. Gupta, Karsten Hennig, Frank Werner: Local search heuristics for two-stage flow shop problems with secondary criterion. Computers & OR 29(2): 123-149 (2002)
7 Mikhail Y. Kovalyov, Frank Werner: Approximation Schemes for Scheduling Jobs with Common Due Date on Parallel Machines to Minimize Total Tardiness. J. Heuristics 8(4): 415-428 (2002)
2001
6EESvetlana A. Kravchenko, Frank Werner: A heuristic algorithm for minimizing mean flow time with unit setups. Inf. Process. Lett. 79(6): 291-296 (2001)
1997
5EEPeter Brucker, Johann Hurink, Frank Werner: Improving Local Search Heuristics for some Scheduling Problems. Part II. Discrete Applied Mathematics 72(1-2): 47-69 (1997)
1996
4EEPeter Brucker, Johann Hurink, Frank Werner: Improving Local Search Heuristics for Some Scheduling Problems-I. Discrete Applied Mathematics 65(1-3): 97-122 (1996)
1995
3EEFrank Werner, Andreas Winkler: Insertion Techniques for the Heuristic Solution of the Job Shop Problem. Discrete Applied Mathematics 58(2): 191-211 (1995)
2EEHeidemarie Bräsel, David Kluge, Frank Werner: A Polynomial Algorithm for an open Shop Problem with Unit Processing Times and Tree Constraints. Discrete Applied Mathematics 59(1): 11-21 (1995)
1993
1EEFrank Werner: On the heuristic solution of the permutation flow shop problem by path algorithms. Computers & OR 20(7): 707-722 (1993)

Coauthor Index

1Jacek Blazewicz [11] [13] [15] [16] [19] [23]
2Heidemarie Bräsel [2] [21]
3Peter Brucker [4] [5]
4Paveena Chaovalitwongse [24]
5Gerd Finke [25]
6Valery S. Gordon [22]
7Jatinder N. D. Gupta [8] [9]
8Karsten Hennig [8]
9André Herms [21]
10Johann Hurink [4] [5]
11Karl Inderfurth [18]
12Adam Janiak [14] [18]
13Jitti Jungwattanakit [24]
14David Kluge [2]
15Mikhail Y. Kovalyov [7] [14] [18] [20]
16Svetlana A. Kravchenko [6]
17Karin Krüger [9]
18Wieslaw Kubiak [14]
19Tsung-Chyan Lai [10]
20Volker Lauff [9] [12]
21Marc Mörig [21]
22Yury L. Orlovich [22]
23Erwin Pesch [11] [13] [15] [16] [19] [23]
24Manop Reodecha [24]
25Yuri N. Sotskov [9] [10]
26Nadezhda Sotskova [10]
27Malgorzata Sterna [11] [13] [15] [16] [19] [23]
28Vitaly A. Strusevich [25]
29Thomas Tautenhahn [21]
30Jan Tusch [21]
31Andreas Winkler [3]

Colors in the list of coauthors

Copyright © Sun May 17 03:24:02 2009 by Michael Ley (ley@uni-trier.de)