| 2009 |
| 9 | EE | Tsung-Che Chiang,
Li-Chen Fu:
Using a family of critical ratio-based approaches to minimize the number of tardy jobs in the job shop with sequence dependent setup times.
European Journal of Operational Research 196(1): 78-92 (2009) |
| 2008 |
| 8 | EE | Hsueh-Chien Cheng,
Tsung-Che Chiang,
Li-Chen Fu:
Multiobjective permutation flowshop scheduling by an adaptive genetic local search algorithm.
IEEE Congress on Evolutionary Computation 2008: 1596-1602 |
| 2006 |
| 7 | | Tsung-Che Chiang,
Li-Chen Fu:
Using Dispatching Rules for Job Shop Scheduling with due Date-based Objectives.
ICRA 2006: 1426-1431 |
| 2005 |
| 6 | | Tsung-Che Chiang,
Li-Chen Fu:
A Virtual Preemption Paradigm for Using Priority Rules to Solve Job Shop Scheduling Problems.
ICRA 2005: 3703-3708 |
| 2004 |
| 5 | EE | Tsung-Che Chiang,
Yi-Shiuan Shen,
Li-Chen Fu:
Adaptive Lot/equipment Matching Strategy and GA based Approach for Optimized Dispatching and Scheduling in a Wafer Probe Center.
ICRA 2004: 3125-3130 |
| 4 | EE | Tsung-Che Chiang,
Li-Chen Fu:
Solving the FMS Scheduling Problem by Critical Ratio-based Heuristics and the Genetic Algorithm.
ICRA 2004: 3131-3136 |
| 3 | EE | Tsung-Che Chiang,
Li-Chen Fu:
Parameter tuning of production scheduling rules by an ant system-embedded genetic algorithm.
RAM 2004: 1089-1094 |
| 2003 |
| 2 | | Shun-Yu Lin,
Li-Chen Fu,
Tsung-Che Chiang,
Yi-Shiuan Shen:
Colored timed petri-net and GA based approach to modeling and scheduling for wafer probe center.
ICRA 2003: 1434-1439 |
| 2002 |
| 1 | | Tsung-Che Chiang,
Li-Chen Fu:
Design of Modern Elevator Group Control Systems.
ICRA 2002: 1465-1470 |