2006 |
6 | EE | Fawaz S. Al-Anzi,
Yuri N. Sotskov,
Ali Allahverdi,
George V. Andreev:
Using mixed graph coloring to minimize total completion time in job shop scheduling.
Applied Mathematics and Computation 182(2): 1137-1148 (2006) |
5 | EE | Yuri N. Sotskov,
Alexandre Dolgui,
Marie-Claude Portmann:
Stability analysis of an optimal balance for an assembly line with fixed cycle time.
European Journal of Operational Research 168(3): 783-797 (2006) |
2004 |
4 | EE | Tsung-Chyan Lai,
Yuri N. Sotskov,
Nadezhda Sotskova,
Frank Werner:
Mean flow time minimization with given bounds of processing times.
European Journal of Operational Research 159(3): 558-573 (2004) |
2002 |
3 | EE | Jatinder N. D. Gupta,
Karin Krüger,
Volker Lauff,
Frank Werner,
Yuri N. Sotskov:
Heuristics for hybrid flow shops with controllable processing times and assignable due dates.
Computers & OR 29(10): 1417-1439 (2002) |
1995 |
2 | EE | Yuri N. Sotskov,
V. K. Leontev,
Evgenii N. Gordeev:
Some Concepts of Stability Analysis in Combinatorial optimization.
Discrete Applied Mathematics 58(2): 169-190 (1995) |
1 | EE | Yuri N. Sotskov,
Natalia V. Shakhlevich:
NP-hardness of Shop-scheduling Problems with Three Jobs.
Discrete Applied Mathematics 59(3): 237-266 (1995) |