2008 |
6 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
Metaheuristic approaches for the two-machine flow-shop problem with weighted late work criterion and common due date.
Computers & OR 35(2): 574-599 (2008) |
2007 |
5 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
A note on the two machine job shop with the weighted late work criterion.
J. Scheduling 10(2): 87-95 (2007) |
2005 |
4 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
Metaheuristics for Late Work Minimization in Two-Machine Flow Shop with Common Due Date.
KI 2005: 222-234 |
3 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
The two-machine flow-shop problem with weighted late work criterion and common due date.
European Journal of Operational Research 165(2): 408-415 (2005) |
2004 |
2 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
Flow Shop Scheduling with Late Work Criterion - Choosing the Best Solution Strategy.
AACC 2004: 68-75 |
1 | EE | Jacek Blazewicz,
Erwin Pesch,
Malgorzata Sterna,
Frank Werner:
Open shop scheduling problems with late work criteria.
Discrete Applied Mathematics 134(1-3): 1-24 (2004) |