2009 |
28 | EE | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
María R. Sierra,
Inés González Rodríguez:
An effective solution for a real cutting stock problem in manufacturing plastic rolls.
Annals OR 166(1): 125-146 (2009) |
2008 |
27 | EE | Inés González Rodríguez,
Jorge Puente,
Ramiro Varela,
Camino R. Vela:
A Study of Schedule Robustness for Job Shop with Uncertainty.
IBERAMIA 2008: 31-41 |
26 | | Miguel A. González,
Camino R. Vela,
Ramiro Varela:
A New Hybrid Genetic Algorithm for the Job Shop Scheduling Problem with Setup Times.
ICAPS 2008: 116-123 |
25 | | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente,
Ramiro Varela:
A New Local Search for the Job Shop Problem with Uncertain Durations.
ICAPS 2008: 124-131 |
24 | EE | Inés González Rodríguez,
Jorge Puente,
Camino R. Vela,
Ramiro Varela:
Semantics of Schedules for the Fuzzy Job-Shop Problem.
IEEE Transactions on Systems, Man, and Cybernetics, Part A 38(3): 655-666 (2008) |
2007 |
23 | EE | Inés González Rodríguez,
Jorge Puente,
Camino R. Vela:
A Multiobjective Approach to Fuzzy Job Shop Problem Using Genetic Algorithms.
CAEPIA 2007: 80-89 |
22 | EE | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente:
A Memetic Approach to Fuzzy Job Shop Based on Expectation Model.
FUZZ-IEEE 2007: 1-6 |
21 | EE | César Muñoz,
María R. Sierra,
Jorge Puente,
Camino R. Vela,
Ramiro Varela:
Improving Cutting-Stock Plans with Multi-objective Genetic Algorithms.
IWINAC (1) 2007: 528-537 |
20 | EE | Inés González Rodríguez,
Jorge Puente,
Camino R. Vela:
Sensitivity Analysis for the Job Shop Problem with Uncertain Durations and Flexible Due Dates.
IWINAC (1) 2007: 538-547 |
19 | EE | Noelia González,
Camino R. Vela,
Inés González Rodríguez:
Comparative Study of Meta-heuristics for Solving Flow Shop Scheduling Problem Under Fuzziness.
IWINAC (1) 2007: 548-557 |
2006 |
18 | EE | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente:
Study of Objective Functions in Fuzzy Job-Shop Problem.
ICAISC 2006: 360-369 |
17 | EE | Miguel A. González,
Camino R. Vela,
Ramiro Varela:
Scheduling with Memetic Algorithms over the Spaces of Semi-active and Active Schedules.
ICAISC 2006: 370-379 |
16 | | Miguel A. González,
María R. Sierra,
Camino R. Vela,
Ramiro Varela,
Jorge Puente:
Combining metaheuristics for the job shop scheduling problem with sequence dependent setup times.
ICSOFT (2) 2006: 211-218 |
15 | EE | Miguel A. González,
Camino R. Vela,
María R. Sierra,
Inés González Rodríguez,
Ramiro Varela:
Comparing Schedule Generation Schemes in Memetic Algorithms for the Job Shop Scheduling Problem with Sequence Dependent Setup Times.
MICAI 2006: 472-482 |
2005 |
14 | EE | Miguel A. González,
María R. Sierra,
Camino R. Vela,
Ramiro Varela:
Genetic Algorithms Hybridized with Greedy Algorithms and Local Search over the Spaces of Active and Semi-active Schedules.
CAEPIA 2005: 231-240 |
13 | EE | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente:
An Evolutionary Approach to Designing and Solving Fuzzy Job-Shop Problems.
IWINAC (2) 2005: 74-83 |
2003 |
12 | EE | Jorge Puente,
Helio R. Díez,
Ramiro Varela,
Camino R. Vela,
Luis P. Hidalgo:
Heuristic Rules and Genetic Algorithms for Open Shop Scheduling Problem.
CAEPIA 2003: 394-403 |
11 | EE | Jorge Puente,
Camino R. Vela,
Carlos Prieto,
Ramiro Varela:
Hybridizing a Genetic Algorithm with Local Search and Heuristic Seeding.
IWANN (2) 2003: 329-336 |
10 | EE | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
Alberto Gomez:
A knowledge-based evolutionary strategy for scheduling problems with bottlenecks.
European Journal of Operational Research 145(1): 57-71 (2003) |
9 | EE | Camino R. Vela,
Jorge Puente,
Cesar Alonso,
Ramiro Varela:
Computación Evolutiva para Resolución de CSPs.
Inteligencia Artificial, Revista Iberoamericana de Inteligencia Artificial 20: 57-68 (2003) |
2002 |
8 | | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
David Serrano,
Ana Suárez:
A New Chromosome Codification for Scheduling Problems.
JCIS 2002: 647-650 |
2001 |
7 | EE | Camino R. Vela,
Ramiro Varela,
Jorge Puente:
Initialization in Genetic Algorithms for Constraint Satisfaction Problems.
IWANN (1) 2001: 693-700 |
2000 |
6 | | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
Cesar Alonso:
Parallel Logic Programming for Problem Solving.
International Journal of Parallel Programming 28(3): 275-319 (2000) |
1999 |
5 | | Ramiro Varela,
Alberto Gomez,
Camino R. Vela,
Jorge Puente,
Cesar Alonso:
Heuristic Generation of the Initial Population in Solving Job Shop Problems by Evolutionary Strategies.
IWANN (1) 1999: 690-699 |
1998 |
4 | | Jorge Puente,
Ramiro Varela,
Camino R. Vela,
Cesar Alonso:
A Parallel Programming Approach to Job Shop Scheduling Constrain Satisfaction Problems.
APPIA-GULP-PRODE 1998: 29-42 |
1997 |
3 | | Camino R. Vela,
Cesar Alonso,
Ramiro Varela,
Jorge Puente:
A Genetic Approach to Computing Independent AND Parallelism in Logic Programs.
IWANN 1997: 566-575 |
1996 |
2 | | Ramiro Varela,
Camino R. Vela,
Jorge Puente:
Efficient Producer/Consumer Parallelism in Logic Programming.
APPIA-GULP-PRODE 1996: 233-244 |
1995 |
1 | | Camino R. Vela,
Antonio Bahamonde:
The Best Nondeterministic Representations of Finite Orderings.
J. Comput. Syst. Sci. 51(3): 486-494 (1995) |