2009 |
15 | EE | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
María R. Sierra,
Inés González Rodríguez:
An effective solution for a real cutting stock problem in manufacturing plastic rolls.
Annals OR 166(1): 125-146 (2009) |
2008 |
14 | EE | Inés González Rodríguez,
Jorge Puente,
Ramiro Varela,
Camino R. Vela:
A Study of Schedule Robustness for Job Shop with Uncertainty.
IBERAMIA 2008: 31-41 |
13 | | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente,
Ramiro Varela:
A New Local Search for the Job Shop Problem with Uncertain Durations.
ICAPS 2008: 124-131 |
12 | EE | Jonathan Lawry,
Inés González Rodríguez:
Non-parametric Density Estimation Based on Label Semantics.
SMPS 2008: 183-189 |
11 | EE | Inés González Rodríguez,
Jorge Puente,
Camino R. Vela,
Ramiro Varela:
Semantics of Schedules for the Fuzzy Job-Shop Problem.
IEEE Transactions on Systems, Man, and Cybernetics, Part A 38(3): 655-666 (2008) |
2007 |
10 | EE | Inés González Rodríguez,
Jorge Puente,
Camino R. Vela:
A Multiobjective Approach to Fuzzy Job Shop Problem Using Genetic Algorithms.
CAEPIA 2007: 80-89 |
9 | EE | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente:
A Memetic Approach to Fuzzy Job Shop Based on Expectation Model.
FUZZ-IEEE 2007: 1-6 |
8 | | Ramiro Varela,
César Muñoz,
María R. Sierra,
Inés González Rodríguez:
A Multi-Objective Genetic Algorithm for Cutting-Stock in Plastic Rolls Industry.
ICSOFT (PL/DPS/KE/MUSE) 2007: 186-193 |
7 | EE | Inés González Rodríguez,
Jorge Puente,
Camino R. Vela:
Sensitivity Analysis for the Job Shop Problem with Uncertain Durations and Flexible Due Dates.
IWINAC (1) 2007: 538-547 |
6 | EE | Noelia González,
Camino R. Vela,
Inés González Rodríguez:
Comparative Study of Meta-heuristics for Solving Flow Shop Scheduling Problem Under Fuzziness.
IWINAC (1) 2007: 548-557 |
2006 |
5 | EE | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente:
Study of Objective Functions in Fuzzy Job-Shop Problem.
ICAISC 2006: 360-369 |
4 | EE | Miguel A. González,
Camino R. Vela,
María R. Sierra,
Inés González Rodríguez,
Ramiro Varela:
Comparing Schedule Generation Schemes in Memetic Algorithms for the Job Shop Scheduling Problem with Sequence Dependent Setup Times.
MICAI 2006: 472-482 |
2005 |
3 | EE | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente:
An Evolutionary Approach to Designing and Solving Fuzzy Job-Shop Problems.
IWINAC (2) 2005: 74-83 |
2004 |
2 | EE | Inés González Rodríguez,
Jonathan Lawry,
James F. Baldwin:
Induction And Fusion Of Fuzzy Prototypes.
International Journal of Uncertainty, Fuzziness and Knowledge-Based Systems 12(4): 409-446 (2004) |
2003 |
1 | EE | Inés González Rodríguez,
Jonathan Lawry,
James F. Baldwin:
An Iterative Fuzzy Prototype Induction Algorithm.
IWANN (1) 2003: 286-293 |