| 2009 |
| 27 | EE | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
María R. Sierra,
Inés González Rodríguez:
An effective solution for a real cutting stock problem in manufacturing plastic rolls.
Annals OR 166(1): 125-146 (2009) |
| 2008 |
| 26 | EE | Inés González Rodríguez,
Jorge Puente,
Ramiro Varela,
Camino R. Vela:
A Study of Schedule Robustness for Job Shop with Uncertainty.
IBERAMIA 2008: 31-41 |
| 25 | | Miguel A. González,
Camino R. Vela,
Ramiro Varela:
A New Hybrid Genetic Algorithm for the Job Shop Scheduling Problem with Setup Times.
ICAPS 2008: 116-123 |
| 24 | | Inés González Rodríguez,
Camino R. Vela,
Jorge Puente,
Ramiro Varela:
A New Local Search for the Job Shop Problem with Uncertain Durations.
ICAPS 2008: 124-131 |
| 23 | | María R. Sierra,
Ramiro Varela:
Pruning Search Space by Dominance Rules in Best First Search for the Job Shop Scheduling Problem.
ICSOFT (PL/DPS/KE) 2008: 273-280 |
| 22 | EE | Inés González Rodríguez,
Jorge Puente,
Camino R. Vela,
Ramiro Varela:
Semantics of Schedules for the Fuzzy Job-Shop Problem.
IEEE Transactions on Systems, Man, and Cybernetics, Part A 38(3): 655-666 (2008) |
| 2007 |
| 21 | | Ramiro Varela,
César Muñoz,
María R. Sierra,
Inés González Rodríguez:
A Multi-Objective Genetic Algorithm for Cutting-Stock in Plastic Rolls Industry.
ICSOFT (PL/DPS/KE/MUSE) 2007: 186-193 |
| 20 | EE | César Muñoz,
María R. Sierra,
Jorge Puente,
Camino R. Vela,
Ramiro Varela:
Improving Cutting-Stock Plans with Multi-objective Genetic Algorithms.
IWINAC (1) 2007: 528-537 |
| 2006 |
| 19 | EE | Miguel A. González,
Camino R. Vela,
Ramiro Varela:
Scheduling with Memetic Algorithms over the Spaces of Semi-active and Active Schedules.
ICAISC 2006: 370-379 |
| 18 | | Miguel A. González,
María R. Sierra,
Camino R. Vela,
Ramiro Varela,
Jorge Puente:
Combining metaheuristics for the job shop scheduling problem with sequence dependent setup times.
ICSOFT (2) 2006: 211-218 |
| 17 | EE | Miguel A. González,
Camino R. Vela,
María R. Sierra,
Inés González Rodríguez,
Ramiro Varela:
Comparing Schedule Generation Schemes in Memetic Algorithms for the Job Shop Scheduling Problem with Sequence Dependent Setup Times.
MICAI 2006: 472-482 |
| 2005 |
| 16 | EE | María R. Sierra,
Ramiro Varela:
Optimal Scheduling with Heuristic Best First Search.
AI*IA 2005: 173-176 |
| 15 | EE | Miguel A. González,
María R. Sierra,
Camino R. Vela,
Ramiro Varela:
Genetic Algorithms Hybridized with Greedy Algorithms and Local Search over the Spaces of Active and Semi-active Schedules.
CAEPIA 2005: 231-240 |
| 14 | EE | Ramiro Varela,
David Serrano,
María R. Sierra:
New Codification Schemas for Scheduling with Genetic Algorithms.
IWINAC (2) 2005: 11-20 |
| 2003 |
| 13 | EE | Jorge Puente,
Helio R. Díez,
Ramiro Varela,
Camino R. Vela,
Luis P. Hidalgo:
Heuristic Rules and Genetic Algorithms for Open Shop Scheduling Problem.
CAEPIA 2003: 394-403 |
| 12 | EE | Jorge Puente,
Camino R. Vela,
Carlos Prieto,
Ramiro Varela:
Hybridizing a Genetic Algorithm with Local Search and Heuristic Seeding.
IWANN (2) 2003: 329-336 |
| 11 | EE | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
Alberto Gomez:
A knowledge-based evolutionary strategy for scheduling problems with bottlenecks.
European Journal of Operational Research 145(1): 57-71 (2003) |
| 10 | EE | Camino R. Vela,
Jorge Puente,
Cesar Alonso,
Ramiro Varela:
Computación Evolutiva para Resolución de CSPs.
Inteligencia Artificial, Revista Iberoamericana de Inteligencia Artificial 20: 57-68 (2003) |
| 2002 |
| 9 | EE | Ramiro Varela,
Elena Soto:
Scheduling as Heuristic Search with State Space Reduction.
IBERAMIA 2002: 815-824 |
| 8 | | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
David Serrano,
Ana Suárez:
A New Chromosome Codification for Scheduling Problems.
JCIS 2002: 647-650 |
| 2001 |
| 7 | EE | Camino R. Vela,
Ramiro Varela,
Jorge Puente:
Initialization in Genetic Algorithms for Constraint Satisfaction Problems.
IWANN (1) 2001: 693-700 |
| 2000 |
| 6 | | Ramiro Varela,
Camino R. Vela,
Jorge Puente,
Cesar Alonso:
Parallel Logic Programming for Problem Solving.
International Journal of Parallel Programming 28(3): 275-319 (2000) |
| 1999 |
| 5 | | Ramiro Varela,
Alberto Gomez,
Camino R. Vela,
Jorge Puente,
Cesar Alonso:
Heuristic Generation of the Initial Population in Solving Job Shop Problems by Evolutionary Strategies.
IWANN (1) 1999: 690-699 |
| 1998 |
| 4 | | Jorge Puente,
Ramiro Varela,
Camino R. Vela,
Cesar Alonso:
A Parallel Programming Approach to Job Shop Scheduling Constrain Satisfaction Problems.
APPIA-GULP-PRODE 1998: 29-42 |
| 1997 |
| 3 | | Camino R. Vela,
Cesar Alonso,
Ramiro Varela,
Jorge Puente:
A Genetic Approach to Computing Independent AND Parallelism in Logic Programs.
IWANN 1997: 566-575 |
| 1996 |
| 2 | | Ramiro Varela,
Camino R. Vela,
Jorge Puente:
Efficient Producer/Consumer Parallelism in Logic Programming.
APPIA-GULP-PRODE 1996: 233-244 |
| 1994 |
| 1 | | Ramiro Varela:
El modelo RPS para la gestion del paralelismo AND independiente en programas logicos.
GULP-PRODE (1) 1994: 251-265 |