2008 |
11 | EE | Shih-Hsu Huang,
Chun-Hua Cheng:
An ILP Approach to the Simultaneous Application of Operation Scheduling and Power Management.
IEICE Transactions 91-A(1): 375-382 (2008) |
10 | EE | Shih-Hsu Huang,
Chun-Hua Cheng:
Power-Management Scheduling for Peak Power Minimization.
J. Inf. Sci. Eng. 24(6): 1647-1668 (2008) |
2007 |
9 | EE | Shih-Hsu Huang,
Chun-Hua Cheng,
Chia-Ming Chang,
Yow-Tyng Nieh:
Clock Period Minimization with Minimum Delay Insertion.
DAC 2007: 970-975 |
8 | EE | Wei-Ting Yen,
Shih-Hsu Huang,
Chun-Hua Cheng:
Simultaneous Operation Scheduling and Operation Delay Selection to Minimize Cycle-by-Cycle Power Differential.
EUC Workshops 2007: 638-647 |
2006 |
7 | EE | Shih-Hsu Huang,
Chun-Hua Cheng:
Operation Scheduling for False Loop Free Circuits.
APCCAS 2006: 1619-1622 |
6 | EE | Shih-Hsu Huang,
Chun-Hua Cheng,
Chung-Hsin Chiang,
Chia-Ming Chang:
Peak Power Minimization through Power Management Scheduling.
APCCAS 2006: 868-871 |
5 | EE | Shih-Hsu Huang,
Chun-Hua Cheng,
Yow-Tyng Nieh,
Wei-Chieh Yu:
Register binding for clock period minimization.
DAC 2006: 439-444 |
4 | EE | Shih-Hsu Huang,
Chun-Hua Cheng,
Chung-Hsin Chiang,
Chia-Ming Chang:
An ILP Approach to the Simultaneous Application of Operation Scheduling and Power Management.
JCIS 2006 |
3 | EE | Shih-Hsu Huang,
Chun-Hua Cheng:
An ILP Approach to the Slack Driven Scheduling Problem.
IEICE Transactions 89-A(6): 1852-1858 (2006) |
2005 |
2 | EE | Shih-Hsu Huang,
Chun-Hua Cheng:
A formal approach to the slack driven scheduling problem in high-level synthesis.
ISCAS (6) 2005: 5633-5636 |
1 | EE | Shih-Hsu Huang,
Chung-Hsin Chiang,
Chun-Hua Cheng:
Three-dimension scheduling under multi-cycle interconnect communications.
IEICE Electronic Express 2(4): 108-114 (2005) |