2009 |
22 | EE | Feng Chen,
Chung-Yee Lee:
Minimizing the makespan in a two-machine cross-docking flow shop problem.
European Journal of Operational Research 193(1): 59-72 (2009) |
2008 |
21 | EE | Bo Chen,
Chung-Yee Lee:
Logistics scheduling with batching and transportation.
European Journal of Operational Research 189(3): 871-876 (2008) |
20 | EE | Joseph Y.-T. Leung,
Chung-Yee Lee,
Chung W. Ng,
Gilbert H. Young:
Preemptive multiprocessor order scheduling to minimize total weighted flowtime.
European Journal of Operational Research 190(1): 40-51 (2008) |
19 | EE | Chung-Yee Lee,
Gang Yu:
Parallel-machine scheduling under potential disruption.
Optimization Letters 2(1): 27-37 (2008) |
18 | EE | Wikrom Jaruphongsa,
Chung-Yee Lee:
Dynamic lot-sizing problem with demand time windows and container-based transportation cost.
Optimization Letters 2(1): 39-51 (2008) |
2007 |
17 | EE | Chung-Yee Lee,
Gang Yu:
Single machine scheduling under potential disruption.
Oper. Res. Lett. 35(4): 541-548 (2007) |
16 | EE | Wikrom Jaruphongsa,
Sila Çetinkaya,
Chung-Yee Lee:
Outbound shipment mode considerations for integrated inventory and delivery lot-sizing decisions.
Oper. Res. Lett. 35(6): 813-822 (2007) |
2006 |
15 | EE | Sila Çetinkaya,
Fatih Mutlu,
Chung-Yee Lee:
A comparison of outbound dispatch policies for integrated inventory and transportation decisions.
European Journal of Operational Research 171(3): 1094-1112 (2006) |
14 | EE | Chung-Yee Lee,
Joseph Y.-T. Leung,
Gang Yu:
Two Machine Scheduling under Disruptions with Transportation Considerations.
J. Scheduling 9(1): 35-48 (2006) |
13 | EE | Irina V. Gribkovskaia,
Chung-Yee Lee,
Vitaly A. Strusevich,
Dominique de Werra:
Three is easy, two is hard: open shop sum-batch scheduling problem refined.
Oper. Res. Lett. 34(4): 459-464 (2006) |
2005 |
12 | EE | Chung-Lun Li,
George Vairaktarakis,
Chung-Yee Lee:
Machine scheduling with deliveries to multiple customer locations.
European Journal of Operational Research 164(1): 39-51 (2005) |
2004 |
11 | EE | Yung-Chia Chang,
Chung-Yee Lee:
Machine scheduling with job delivery coordination.
European Journal of Operational Research 158(2): 470-487 (2004) |
10 | EE | Chung-Yee Lee:
Inventory replenishment model: lot sizing versus just-in-time delivery.
Oper. Res. Lett. 32(6): 581-590 (2004) |
2001 |
9 | EE | Chung-Yee Lee,
Lei Lei:
Multiple-Project Scheduling with Controllable Project Duration and Hard Resource Constraint: Some Solvable Cases.
Annals OR 102(1-4): 287-307 (2001) |
2000 |
8 | | Chung-Yee Lee,
Yong He,
Guochun Tang:
A note on "parallel machine scheduling with non-simultaneous machine available time".
Discrete Applied Mathematics 100(1-2): 133-135 (2000) |
1996 |
7 | EE | Chung-Yee Lee,
Chung-Lun Li:
On the Fixed Interval Due-date Scheduling Problem.
Discrete Applied Mathematics 68(1-2): 101-117 (1996) |
1993 |
6 | EE | Chung-Yee Lee,
Surya Danusaputro Liman:
Capacitated Two-Parallel Machines Scheduling to Minimize Sum of Job Completion Times.
Discrete Applied Mathematics 41(3): 211-222 (1993) |
1992 |
5 | | Chung-Yee Lee,
Surya Danusaputro Liman:
Single Machine Flow-Time Scheduling with Scheduled Maintenance.
Acta Inf. 29(4): 375-382 (1992) |
1991 |
4 | EE | Chung-Yee Lee,
Surya Danusaputro Liman,
Chen-Sin Lin:
Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date.
Computers & OR 18(4): 379-389 (1991) |
3 | EE | Chung-Yee Lee:
Parallel machines scheduling with nonsimultaneous machine available time.
Discrete Applied Mathematics 30(1): 53-61 (1991) |
1989 |
2 | | Jing-Jang Hwang,
Yuan-Chieh Chow,
Frank D. Anger,
Chung-Yee Lee:
Scheduling Precedence Graphs in Systems with Interprocessor Communication Times.
SIAM J. Comput. 18(2): 244-257 (1989) |
1988 |
1 | EE | Chung-Yee Lee,
J. David Massey:
Multiprocessor scheduling: combining LPT and MULTIFIT.
Discrete Applied Mathematics 20(3): 233-242 (1988) |