![]() |
| 2003 | ||
|---|---|---|
| 5 | Eckhard Freund, Dirk H. Pensky: Distributing 3D manufacturing simulations to realize the digital plant. ICRA 2003: 1705-1710 | |
| 4 | Eckhard Freund, Dirk H. Pensky: Hierarchically Distributed Processing and Coupling of Manufacturing Simulations and Production Control. PDPTA 2003: 596-601 | |
| 2002 | ||
| 3 | Eckhard Freund, Dirk H. Pensky: COSIMIR Factory: Extending the use of Manufacturing Simulations. ICRA 2002: 2805-2810 | |
| 2001 | ||
| 2 | Eckhard Freund, Alfred Hypki, Dirk H. Pensky: New Architecture for Corporate Integration of Simulation and Production Control in Industrial Applications. ICRA 2001: 806-811 | |
| 1995 | ||
| 1 | Eckhard Freund, F. Dierks, Dirk H. Pensky, D. Rokossa: Realisierung eines Mobilen Roboters für Kommissionieraufgaben. AMS 1995: 20-29 | |
| 1 | F. Dierks | [1] |
| 2 | Eckhard Freund | [1] [2] [3] [4] [5] |
| 3 | Alfred Hypki | [2] |
| 4 | D. Rokossa | [1] |