2005 |
24 | EE | Thomas Bousonville,
Filippo Focacci,
Claude Le Pape,
Wim Nuijten,
Frederic Paulin,
Jean-Francois Puget,
Anna Robert,
Alireza Sadeghin:
Integration of Rules and Optimization in Plant PowerOps.
CPAIOR 2005: 1-15 |
23 | EE | Philippe Baptiste,
Claude Le Pape:
Scheduling a single machine to minimize a regular objective function under setup constraints.
Discrete Optimization 2(1): 83-99 (2005) |
22 | EE | Emilie Danna,
Edward Rothberg,
Claude Le Pape:
Exploring relaxation induced neighborhoods to improve MIP solutions.
Math. Program. 102(1): 71-90 (2005) |
2004 |
21 | EE | Alain Chabrier,
Emilie Danna,
Claude Le Pape,
Laurent Perron:
Solving a Network Design Problem.
Annals OR 130(1-4): 217-239 (2004) |
2002 |
20 | EE | Claude Le Pape,
Laurent Perron,
Jean-Charles Régin,
Paul Shaw:
Robust and Parallel Solving of a Network Design Problem.
CP 2002: 633-648 |
19 | EE | Giorgio C. Buttazzo,
Avi Efrati,
John N. Hooker,
Claude Le Pape,
Joseph Sifakis:
Abstracts of Invited Talks.
Electr. Notes Theor. Comput. Sci. 65(6): (2002) |
2000 |
18 | | Philippe Baptiste,
Claude Le Pape:
Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems.
Constraints 5(1/2): 119-139 (2000) |
17 | | J. Christopher Beck,
Andrew J. Davenport,
Claude Le Pape:
Introduction.
Constraints 5(4): 327-334 (2000) |
16 | EE | Claude Le Pape,
Jean-Francois Puget,
Colonel Moreau,
Philippe Darneau:
Predictive Personnel Management.
IEEE Intelligent Systems 15(1): 73-77 (2000) |
1999 |
15 | | Claude Le Pape,
Philippe Baptiste:
Heuristic Control of a Constraint-Based Algorithm for the Preemptive Job-Shop Scheduling Problem.
J. Heuristics 5(3): 305-325 (1999) |
1998 |
14 | EE | Philippe Baptiste,
Claude Le Pape,
Laurent Péridy:
Global Constraints for Partial CSPs: A Case-Study of Resource and Due Date Constraints.
CP 1998: 87-101 |
13 | | Claude Le Pape,
James M. Crawford,
Barry Fox,
Thomas Schiex:
Introduction to a Benchmark Column in CONSTRAINTS.
Constraints 3(2/3): 255-256 (1998) |
12 | | Claude Le Pape,
Philippe Baptiste:
Resource Constraints for Preemptive Job-shop Scheduling.
Constraints 3(4): 263-287 (1998) |
11 | | Claude Le Pape:
Constraint propagation for ordering, abstraction, and aggregation relations.
J. Exp. Theor. Artif. Intell. 10(1): 63-76 (1998) |
10 | | Wim Nuijten,
Claude Le Pape:
Constraint-Based Job Shop Scheduling with \sc Ilog Scheduler.
J. Heuristics 3(4): 271-286 (1998) |
1997 |
9 | | Philippe Baptiste,
Claude Le Pape:
Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems.
CP 1997: 375-389 |
1996 |
8 | | Claude Le Pape,
Philippe Baptiste:
Constraint Propagation Techniques for Disjunctive Scheduling: The Preemptive Case.
ECAI 1996: 619-623 |
1995 |
7 | | Philippe Baptiste,
Claude Le Pape:
A Theoretical and Experimental Comparison of Constraint Propagation Techniques for Disjunctive Scheduling.
IJCAI (1) 1995: 600-606 |
1994 |
6 | | Claude Le Pape,
Jean-Francois Puget,
Colonel Moreau,
Philippe Darneau:
PMFP: The Use of Constraint-Based Programming for Predictive Personnel Management.
ECAI 1994: 8-12 |
1992 |
5 | | Claude Le Pape:
Using Constraint Propagation in Blackboard Systems: A Flexible Software Architecture for Reactive and Distributed Systems.
IEEE Computer 25(5): 60-62 (1992) |
1991 |
4 | | Karl G. Kempf,
Claude Le Pape,
Stephen F. Smith,
Barry Fox:
Issues in the Design of AI-Based Schedulers - Workshop Report.
AI Magazine 11(5): 37-46 (1991) |
1988 |
3 | EE | Anne Collinot,
Claude Le Pape,
Gérard Pinoteau:
SONIA: A knowledge-based scheduling system.
AI in Engineering 3(2): 86-94 (1988) |
1987 |
2 | | Anne Collinot,
Claude Le Pape:
Controlling Constraint Propagation.
IJCAI 1987: 1032-1034 |
1 | | Claude Le Pape,
Stephen F. Smith:
Management of Temporal Constraints for Factory Scheduling.
Temporal Aspects in Information Systems 1987: 159-170 |