2008 |
16 | EE | Pierre Hansen,
Ceyda Oguz,
Nenad Mladenovic:
Variable neighborhood search for minimum cost berth allocation.
European Journal of Operational Research 191(3): 636-649 (2008) |
2006 |
15 | EE | Jacek Blazewicz,
Fred Glover,
Marta Kasprzak,
Wojciech T. Markiewicz,
Ceyda Oguz,
Dietrich Rebholz-Schuhmann,
Aleksandra Swiercz:
Dealing with repetitions in sequencing by hybridization.
Computational Biology and Chemistry 30(5): 313-320 (2006) |
2005 |
14 | EE | Jacek Blazewicz,
Beniamin Dziurdza,
Wojciech T. Markiewicz,
Ceyda Oguz:
The Parallel Genetic Algorithm for Designing DNA Randomizations in a Combinatorial Protein Experiment.
PPAM 2005: 1097-1105 |
13 | EE | Muhammet Fikret Ercan,
Ceyda Oguz:
Performance of local search heuristics on scheduling a class of pipelined multiprocessor tasks.
Computers & Electrical Engineering 31(8): 537-555 (2005) |
12 | EE | Yakov Zinder,
Van Ha Do,
Ceyda Oguz:
Computational complexity of some scheduling problems with multiprocessor tasks.
Discrete Optimization 2(4): 391-408 (2005) |
11 | EE | Ceyda Oguz,
Muhammet Fikret Ercan:
A Genetic Algorithm for Hybrid Flow-shop Scheduling with Multiprocessor Tasks.
J. Scheduling 8(4): 323-351 (2005) |
2004 |
10 | EE | Ceyda Oguz,
Yakov Zinder,
Van Ha Do,
Adam Janiak,
Maciej Lichtenstein:
Hybrid flow-shop scheduling problems with multiprocessor task systems.
European Journal of Operational Research 152(1): 115-131 (2004) |
2003 |
9 | EE | Ceyda Oguz,
Yu-Fai Fung,
Muhammet Fikret Ercan,
X. T. Qi:
Parallel Genetic Algorithm for a Flow-Shop Problem with Multiprocessor Tasks.
ICCSA (1) 2003: 987-997 |
8 | EE | Ceyda Oguz,
Yu-Fai Fung,
Muhammet Fikret Ercan,
X. T. Qi:
Parallel Genetic Algorithm for a Flow-Shop Problem with Multiprocessor Tasks.
International Conference on Computational Science 2003: 548-559 |
7 | EE | Ceyda Oguz,
Muhammet Fikret Ercan,
T. C. Edwin Cheng,
Yu-Fai Fung:
Heuristic algorithms for multiprocessor task scheduling in a two-stage hybrid flow-shop.
European Journal of Operational Research 149(2): 390-403 (2003) |
2001 |
6 | EE | Muhammet Fikret Ercan,
Ceyda Oguz,
Yu-Fai Fung:
Performance Evaluation of Heuristics for Scheduling Pipelined Multiprocessor Tasks.
International Conference on Computational Science (1) 2001: 61-70 |
5 | EE | W. K. Yeung,
Ceyda Oguz,
T. C. Edwin Cheng:
Minimizing Weighted Number of Early and Tardy Jobs with a Common Due Window Involving Location Penalty.
Annals OR 108(1-4): 33-54 (2001) |
4 | EE | W. K. Yeung,
Ceyda Oguz,
T. C. Edwin Cheng:
Single-machine scheduling with a common due window.
Computers & OR 28(2): 157-175 (2001) |
1999 |
3 | EE | Muhammet Fikret Ercan,
Ceyda Oguz,
Yu-Fai Fung:
Job Scheduling in a Multi-layer Vision System.
Euro-Par 1999: 317-321 |
1997 |
2 | EE | Ceyda Oguz,
Bertrand M. T. Lin,
T. C. Edwin Cheng:
Two-stage flowshop scheduling with a common second-stage machine.
Computers & OR 24(12): 1169-1174 (1997) |
1994 |
1 | EE | T. C. Edwin Cheng,
Zhi-Long Chen,
Ceyda Oguz:
One-machine batching and sequencing of multiple-type items.
Computers & OR 21(7): 717-721 (1994) |