2009 |
19 | EE | Feng-Cheng Lin,
Jen-Shin Hong,
Bertrand M. T. Lin:
A two-machine flowshop problem with processing time-dependent buffer constraints - An application in multimedia presentations.
Computers & OR 36(4): 1158-1175 (2009) |
18 | EE | T. C. Edwin Cheng,
Bertrand M. T. Lin:
Johnson's rule, composite jobs and the relocation problem.
European Journal of Operational Research 192(3): 1008-1013 (2009) |
2008 |
17 | EE | Ming-Tsung Chen,
Bertrand M. T. Lin,
Shian-Shyong Tseng:
Multicast routing and wavelength assignment with delay constraints in WDM networks with heterogeneous capabilities.
J. Network and Computer Applications 31(1): 47-65 (2008) |
2007 |
16 | EE | Bertrand M. T. Lin,
Alexander V. Kononov:
Customer order scheduling to minimize the number of late jobs.
European Journal of Operational Research 183(2): 944-948 (2007) |
2006 |
15 | EE | Ming-Tsung Chen,
Shian-Shyong Tseng,
Bertrand M. T. Lin:
Dynamic multicast routing under delay constraints in WDM networks with heterogeneous light splitting capabilities.
Computer Communications 29(9): 1492-1503 (2006) |
14 | EE | Shyong Jian Shyu,
Bertrand M. T. Lin,
Tsung-Shen Hsiao:
Ant colony optimization for the cell assignment problem in PCS networks.
Computers & OR 33: 1713-1740 (2006) |
13 | EE | Alexander V. Kononov,
Bertrand M. T. Lin:
On relocation problems with multiple identical working crews.
Discrete Optimization 3(4): 366-381 (2006) |
12 | EE | Bertrand M. T. Lin,
H. L. Huang:
On the relocation problem with a second working crew for resource recycling.
Int. J. Systems Science 37(1): 27-34 (2006) |
2005 |
11 | EE | Bertrand M. T. Lin,
T. C. Edwin Cheng:
Two-Machine Flowshop Batching and Scheduling.
Annals OR 133(1-4): 149-161 (2005) |
10 | EE | Andy An-Kai Jeng,
Bertrand M. T. Lin:
Minimizing the total completion time in single-machine scheduling with step-deteriorating jobs.
Computers & OR 32: 521-536 (2005) |
9 | EE | Gwo-Jen Hwang,
Bertrand M. T. Lin,
Hsien-Hao Tseng,
Tsung-Liang Lin:
On the development of a computer-assisted testing system with genetic test sheet-generating approach.
IEEE Transactions on Systems, Man, and Cybernetics, Part C 35(4): 590-594 (2005) |
2004 |
8 | EE | Shyong Jian Shyu,
Peng-Yeng Yin,
Bertrand M. T. Lin:
An Ant Colony Optimization Algorithm for the Minimum Weight Vertex Cover Problem.
Annals OR 131(1-4): 283-304 (2004) |
7 | EE | T. C. Edwin Cheng,
Qing Ding,
Bertrand M. T. Lin:
A concise survey of scheduling with time-dependent processing times.
European Journal of Operational Research 152(1): 1-13 (2004) |
2003 |
6 | EE | Shyong Jian Shyu,
Peng-Yeng Yin,
Bertrand M. T. Lin,
Mohamed Haouari:
Ant-Tree: an ant colony optimization approach to the generalized minimum spanning tree problem.
J. Exp. Theor. Artif. Intell. 15(1): 103-112 (2003) |
2001 |
5 | EE | Bertrand M. T. Lin,
T. C. Edwin Cheng:
Batch scheduling in the no-wait two-machine flowshop to minimize the makespan.
Computers & OR 28(7): 613-624 (2001) |
1999 |
4 | EE | Bertrand M. T. Lin:
The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine.
Computers & OR 26(7): 695-698 (1999) |
1997 |
3 | EE | Ceyda Oguz,
Bertrand M. T. Lin,
T. C. Edwin Cheng:
Two-stage flowshop scheduling with a common second-stage machine.
Computers & OR 24(12): 1169-1174 (1997) |
2 | EE | Shian-Shyong Tseng,
Bertrand M. T. Lin,
Sue Huei Liu:
Construction N Latin Squares for ???.
J. Inf. Sci. Eng. 13(4): 605-613 (1997) |
1992 |
1 | | Bertrand M. T. Lin,
Shian-Shyong Tseng:
Resource-Requirment Minimization in Relocation Problems with Precedence Constraints.
ICCI 1992: 26-29 |