2004 |
9 | EE | Zhi-Long Chen:
Simultaneous Job Scheduling and Resource Allocation on Parallel Machines.
Annals OR 129(1-4): 135-153 (2004) |
2002 |
8 | EE | T. C. Edwin Cheng,
Zhi-Long Chen,
Natalia V. Shakhlevich:
Common due date assignment and scheduling with ready times.
Computers & OR 29(14): 1957-1967 (2002) |
7 | EE | Zhi-Long Chen,
Shanling Li,
Devanath Tirupati:
A scenario-based stochastic programming approach for technology and capacity planning.
Computers & OR 29(7): 781-806 (2002) |
2001 |
6 | EE | Feng Zhang,
Guochun Tang,
Zhi-Long Chen:
A 3/2-approximation algorithm for parallel machine scheduling with controllable processing times.
Oper. Res. Lett. 29(1): 41-47 (2001) |
1997 |
5 | EE | Zhi-Long Chen:
Parallel Machine Scheduling with Time Dependent Processing Times.
Discrete Applied Mathematics 75(1): 103 (1997) |
4 | EE | Zhi-Long Chen,
Warren B. Powell:
A note on Bertsekas' small-label-first strategy.
Networks 29(2): 111-116 (1997) |
3 | EE | Zhi-Long Chen,
Qing Lu,
Guochun Tang:
Single machine scheduling with discretely controllable processing times.
Oper. Res. Lett. 21(2): 69-76 (1997) |
1995 |
2 | EE | Chung-Lun Li,
T. C. Edwin Cheng,
Zhi-Long Chen:
Single-machine scheduling to minimize the weighted number of early and tardy agreeable jobs.
Computers & OR 22(2): 205-219 (1995) |
1994 |
1 | EE | T. C. Edwin Cheng,
Zhi-Long Chen,
Ceyda Oguz:
One-machine batching and sequencing of multiple-type items.
Computers & OR 21(7): 717-721 (1994) |