2006 | ||
---|---|---|
1 | EE | Ji-Bo Wang, C. T. Daniel Ng, T. C. Edwin Cheng, Li-Li Liu: Minimizing total completion time in a two-machine flow shop with deteriorating jobs. Applied Mathematics and Computation 180(1): 185-193 (2006) |
1 | T. C. Edwin Cheng | [1] |
2 | C. T. Daniel Ng | [1] |
3 | Ji-Bo Wang | [1] |