2008 |
8 | EE | Ji-Bo Wang:
Erratum to: A note on flow shop scheduling problems with a learning effect on no-idle dominant machines [Appl. Math. Computation 184 (2007) 945-949].
Applied Mathematics and Computation 202(2): 897-898 (2008) |
7 | EE | Ji-Bo Wang,
C. T. Ng,
T. C. Edwin Cheng:
Single-machine scheduling with deteriorating jobs under a series-parallel graph constraint.
Computers & OR 35(8): 2684-2693 (2008) |
2007 |
6 | EE | Ji-Bo Wang,
T. C. Edwin Cheng:
Scheduling Problems with the Effects of deterioration and Learning.
APJOR 24(2): 245-261 (2007) |
5 | EE | Ji-Bo Wang:
Flow shop scheduling problems with decreasing linear deterioration under dominant machines.
Computers & OR 34(7): 2043-2058 (2007) |
4 | EE | Ji-Bo Wang,
Zun-Quan Xia:
Single machine scheduling problems with controllable processing times and total absolute differences penalties.
European Journal of Operational Research 177(1): 638-645 (2007) |
2006 |
3 | EE | Ji-Bo Wang,
C. T. Daniel Ng,
T. C. Edwin Cheng,
Li-Li Liu:
Minimizing total completion time in a two-machine flow shop with deteriorating jobs.
Applied Mathematics and Computation 180(1): 185-193 (2006) |
2 | EE | Ji-Bo Wang,
Feng Shan,
Bo Jiang,
Li-Yan Wang:
Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time.
Applied Mathematics and Computation 182(1): 947-954 (2006) |
2005 |
1 | EE | Ji-Bo Wang,
Zun-Quan Xia:
Scheduling jobs under decreasing linear deterioration.
Inf. Process. Lett. 94(2): 63-69 (2005) |