2008 |
15 | EE | Sigrid Knust:
Turnier- und Sportligaplanung.
Taschenbuch der Algorithmen 2008: 275-284 |
14 | EE | Sigrid Knust:
Scheduling sports tournaments on a single court minimizing waiting times.
Oper. Res. Lett. 36(4): 471-476 (2008) |
2006 |
13 | EE | Sigrid Knust,
Michael von Thaden:
Balanced home-away assignments.
Discrete Optimization 3(4): 354-365 (2006) |
2005 |
12 | EE | Johann Hurink,
Sigrid Knust:
Tabu search algorithms for job-shop problems with a single transport robot.
European Journal of Operational Research 162(1): 99-111 (2005) |
11 | EE | Peter Brucker,
Sigrid Knust,
Guoqing Wang:
Complexity results for flow-shop problems with a single server.
European Journal of Operational Research 165(2): 398-407 (2005) |
2004 |
10 | EE | Philippe Baptiste,
Peter Brucker,
Sigrid Knust,
Vadim G. Timkovsky:
Ten notes on equal-processing-time scheduling.
4OR 2(2): 111-127 (2004) |
9 | EE | Peter Brucker,
Sigrid Knust,
T. C. Edwin Cheng,
Natalia V. Shakhlevich:
Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation Delays.
Annals OR 129(1-4): 81-106 (2004) |
2003 |
8 | EE | Peter Brucker,
Sigrid Knust:
Sequencing and scheduling.
European Journal of Operational Research 149(2): 247-248 (2003) |
7 | EE | Peter Brucker,
Sigrid Knust:
Lower bounds for resource-constrained project scheduling problems.
European Journal of Operational Research 149(2): 302-313 (2003) |
2002 |
6 | EE | Peter Brucker,
Sigrid Knust:
Lower Bounds for Scheduling a Single Robot in a Job-Shop Environment.
Annals OR 115(1-4): 147-172 (2002) |
5 | | Johann Hurink,
Sigrid Knust:
A tabu search algorithm for scheduling a single robot in a job-shop environment.
Discrete Applied Mathematics 119(1-2): 181-203 (2002) |
2001 |
4 | | Johann Hurink,
Sigrid Knust:
Makespan minimization for flow-shop problems with transportation times and a single robot.
Discrete Applied Mathematics 112(1-3): 199-216 (2001) |
3 | EE | Johann Hurink,
Sigrid Knust:
List scheduling in a parallel machine environment with precedence constraints and setup times.
Oper. Res. Lett. 29(5): 231-239 (2001) |
2000 |
2 | EE | Peter Brucker,
Sigrid Knust:
Resource-Constrained Project Scheduling and Timetabling.
PATAT 2000: 277-293 |
1999 |
1 | EE | Peter Brucker,
Sigrid Knust:
Complexity Results for Single-Machine Problems with Positive Finish-Start Time-Lags.
Computing 63(4): 299-316 (1999) |