![]() |
| 2005 | ||
|---|---|---|
| 6 | EE | Guoqing Wang, Hongyi Sun, Chengbin Chu: Preemptive Scheduling with Availability Constraints to Minimize Total Weighted Completion Times. Annals OR 133(1-4): 183-192 (2005) |
| 5 | EE | Peter Brucker, Sigrid Knust, Guoqing Wang: Complexity results for flow-shop problems with a single server. European Journal of Operational Research 165(2): 398-407 (2005) |
| 2003 | ||
| 4 | EE | Hongyi Sun, Guoqing Wang: Parallel machine earliness and tardiness scheduling with proportional weights. Computers & OR 30(5): 801-808 (2003) |
| 2000 | ||
| 3 | EE | T. C. Edwin Cheng, Guoqing Wang: An improved heuristic for two-machine flowshop scheduling with an availability constraint. Oper. Res. Lett. 26(5): 223-229 (2000) |
| 1999 | ||
| 2 | EE | T. C. Edwin Cheng, Guoqing Wang, Chelliah Sriskandarajah: One-operator-two-machine flowshop scheduling with setup and dismounting times. Computers & OR 26(7): 715-730 (1999) |
| 1 | EE | T. C. Edwin Cheng, Guoqing Wang: Two-Machine Flowshop Scheduling with Consecutive Availability Constraints. Inf. Process. Lett. 71(2): 49-54 (1999) |
| 1 | Peter Brucker | [5] |
| 2 | T. C. Edwin Cheng | [1] [2] [3] |
| 3 | Chengbin Chu | [6] |
| 4 | Sigrid Knust | [5] |
| 5 | Chelliah Sriskandarajah | [2] |
| 6 | Hongyi Sun | [4] [6] |