2008 |
43 | | Scott J. Mason,
Raymond R. Hill,
Lars Mönch,
Oliver Rose,
Thomas Jefferson,
John W. Fowler:
Proceedings of the 2008 Winter Simulation Conference, Global Gateway to Discovery, WSC 2008, InterContinental Hotel, Miami, Florida, USA, December 7-10, 2008
WSC 2008 |
42 | EE | Tim Lant,
Megan Jehn,
Cody Christensen,
Ozgur M. Araz,
John W. Fowler:
Simulating pandemic influenza preparedness plans for a public university: A hierarchical system dynamics approach.
Winter Simulation Conference 2008: 1305-1313 |
41 | EE | Chen-Fu Chien,
Stéphane Dauzère-Pérès,
Hans Ehm,
John W. Fowler,
Zhibin Jiang,
Shekar Krishnaswamy,
Lars Mönch,
Reha Uzsoy:
Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes.
Winter Simulation Conference 2008: 2093-2099 |
40 | EE | Jens Zimmermann,
Scott J. Mason,
John W. Fowler,
Lars Mönch:
Determining an appropriate number of FOUPs in semiconductor wafer fabrication facilities.
Winter Simulation Conference 2008: 2164-2170 |
39 | EE | Rachel T. Johnson,
Bradley Jones,
John W. Fowler,
Douglas C. Montgomery:
Comparing designs for computer simulation experiments.
Winter Simulation Conference 2008: 463-470 |
38 | EE | John W. Fowler,
Pornsarun Wirojanagud,
Esma Senturk Gel:
Heuristics for workforce planning with worker differences.
European Journal of Operational Research 190(3): 724-740 (2008) |
37 | EE | Michele E. Pfund,
Hari Balasubramanian,
John W. Fowler,
Scott J. Mason,
Oliver Rose:
A multi-criteria approach for scheduling semiconductor wafer fabrication facilities.
J. Scheduling 11(1): 29-47 (2008) |
2007 |
36 | EE | Todd R. Huschka,
Brian T. Denton,
Serhat Gul,
John W. Fowler:
Bi-criteria evaluation of an outpatient procedure center via simulation.
Winter Simulation Conference 2007: 1510-1518 |
35 | EE | Jennifer McNeill Bekki,
John W. Fowler,
Gerald T. Mackulak,
Barry L. Nelson:
Using quantiles in ranking and selection procedures.
Winter Simulation Conference 2007: 1722-1728 |
34 | EE | Rajesh Swaminathan,
Michele E. Pfund,
John W. Fowler,
Scott J. Mason,
Ahmet B. Keha:
Impact of permutation enforcement when minimizing total weighted tardiness in dynamic flowshops with uncertain processing times.
Computers & OR 34(10): 3055-3068 (2007) |
33 | EE | Lars Mönch,
Rene Schabacker,
Detlef Pabst,
John W. Fowler:
Genetic algorithm-based subproblem solution procedures for a modified shifting bottleneck heuristic for complex job shops.
European Journal of Operational Research 177(3): 2100-2118 (2007) |
32 | EE | Cem Vardar,
Esma Senturk Gel,
John W. Fowler:
A framework for evaluating remote diagnostics investment decisions for semiconductor equipment suppliers.
European Journal of Operational Research 180(3): 1411-1426 (2007) |
31 | EE | Jeffrey D. Laub,
John W. Fowler,
Ahmet B. Keha:
Minimizing makespan with multiple-orders-per-job in a two-machine flowshop.
European Journal of Operational Research 182(1): 63-79 (2007) |
2006 |
30 | | John W. Fowler,
Barry L. Nelson,
Michael Pinedo,
Oliver Rose:
Simulation & Scheduling: Companions or Competitors for Improving the Performance of Manufacturing Systems, 10.-15. July 2005
Internationales Begegnungs- und Forschungszentrum für Informatik (IBFI), Schloss Dagstuhl, Germany 2006 |
29 | EE | Jennifer McNeill Bekki,
Gerald T. Mackulak,
John W. Fowler:
Indirect cycle-time quantile estimation for non-FIFO dispatching policies.
Winter Simulation Conference 2006: 1829-1835 |
28 | EE | Bosun Kim,
Esma Senturk Gel,
John W. Fowler,
W. Matthew Carlyle,
Jyrki Wallenius:
Evaluation of nondominated solution sets for k.
European Journal of Operational Research 173(2): 565-582 (2006) |
2005 |
27 | EE | John W. Fowler,
Barry L. Nelson,
Michael Pinedo,
Oliver Rose:
05281 Abstracts Collection - Simulation & Scheduling: Companions or Competitors for Improving the Performance of Manufacturing Systems.
Simulation & Scheduling 2005 |
26 | EE | John W. Fowler,
Barry L. Nelson,
Michael Pinedo,
Oliver Rose:
05281 Executive Summary - Simulation & Scheduling: Companions or Competitors for Improving the Performance of Manufacturing Systems.
Simulation & Scheduling 2005 |
25 | EE | Jesus A. Jimenez,
Gerald T. Mackulak,
John W. Fowler:
Efficient simulations for capacity analysis and automated material handling system design in semiconductor wafer fabs.
Winter Simulation Conference 2005: 2157-2161 |
24 | EE | Rachel T. Johnson,
John W. Fowler,
Gerald T. Mackulak:
A discrete event simulation model simplification technique.
Winter Simulation Conference 2005: 2172-2176 |
23 | EE | Jennifer E. McNeill,
John W. Fowler,
Gerald T. Mackulak,
Barry L. Nelson:
Cycle-time quantile estimation in manufacturing systems employing dispatching rules.
Winter Simulation Conference 2005: 749-755 |
22 | EE | Lars Mönch,
Hari Balasubramanian,
John W. Fowler,
Michele E. Pfund:
Heuristic scheduling of jobs on parallel batch machines with incompatible job families and unequal ready times.
Computers & OR 32: 2731-2750 (2005) |
21 | EE | Imelda C. Perez,
John W. Fowler,
W. Matthew Carlyle:
Minimizing total weighted tardiness on a single batch process machine with incompatible job families.
Computers & OR 32: 327-341 (2005) |
20 | EE | John W. Fowler,
Bosun Kim,
W. Matthew Carlyle,
Esma Senturk Gel,
Shwu-Min Horng:
Evaluating solution sets of a posteriori solution techniques for bi-criteria combinatorial optimization problems.
J. Scheduling 8(1): 75-96 (2005) |
2004 |
19 | EE | Peter Lendermann,
Boon-Ping Gan,
Yoon Loong Loh,
Hiap Keong Tan,
Sip Khean Lieu,
John W. Fowler,
Leon F. McGinnis:
Analysis of a Borderless Fab Scenario in a Distributed Simulation Testbed.
Winter Simulation Conference 2004: 1896- |
18 | EE | Chin Soon Chong,
Peter Lendermann,
Boon-Ping Gan,
Brett Marc Duarte,
John W. Fowler,
Thomas E. Callarman:
Analysis of a Customer Demand Driven Semiconductor Supply Chain in a Distributed Simulation Test Bed.
Winter Simulation Conference 2004: 1902- |
17 | EE | Rachel T. Johnson,
Sonia E. Leach,
John W. Fowler,
Gerald T. Mackulak:
Variance-Based Sampling for Cycle Time - Throughput Confidence Intervals.
Winter Simulation Conference 2004: 716-720 |
2003 |
16 | EE | Jennifer E. McNeill,
Gerald T. Mackulak,
John W. Fowler:
Factory capacity and throughput planning: indirect estimation of cycle time quantiles from discrete event simulation models using the Cornish-Fisher expansion.
Winter Simulation Conference 2003: 1377-1382 |
15 | EE | Jeffery K. Cochran,
Shwu-Min Horng,
John W. Fowler:
A multi-population genetic algorithm to solve multi-objective scheduling problems for parallel machines.
Computers & OR 30(7): 1087-1102 (2003) |
2002 |
14 | EE | Brett Marc Duarte,
John W. Fowler,
Kraig Knutson,
Esma Senturk Gel,
Dan Shunk:
Manufacturing supply chain applications 2: parameterization of fast and accurate simulations for complex supply networks.
Winter Simulation Conference 2002: 1327-1336 |
13 | EE | Jesus A. Jimenez,
Bosun Kim,
John W. Fowler,
Gerald T. Mackulak,
You In Choung,
Dong Jin Kim:
Material handling: operational modeling and simulation of an inter-bay AMHS in semiconductor wafer fabrication.
Winter Simulation Conference 2002: 1377-1382 |
12 | EE | Chanettre Rasmidatta,
Shari Murray,
John W. Fowler,
Gerald T. Mackulak:
Modeling methodology: new approaches for simulation of wafer fabrication: the use of control variates and calibration metrics.
Winter Simulation Conference 2002: 1414-1422 |
11 | EE | Juergen Potoradi,
Ong Siong Boon,
Scott J. Mason,
John W. Fowler,
Michele E. Pfund:
Semiconductor manufacturing: using simulation-based scheduling to maximize demand fulfillment in a semiconductor assembly facility.
Winter Simulation Conference 2002: 1857-1861 |
2001 |
10 | EE | W. Matthew Carlyle,
Bosun Kim,
John W. Fowler,
Esma Senturk Gel:
Comparison of Multiple Objective Genetic Algorithms for Parallel Machine Scheduling Problems.
EMO 2001: 472-485 |
9 | EE | Sungmin Park,
Gerald T. Mackulak,
John W. Fowler:
Cycle time versus throughput analysis: an overall framework for generating simulation-based cycle time-throughput curves.
Winter Simulation Conference 2001: 1178-1187 |
2000 |
8 | EE | Scott J. Mason,
John W. Fowler:
Semiconductor manufacturing scheduling: maximizing delivery performance in semiconductor wafer fabrication facilities.
Winter Simulation Conference 2000: 1458-1463 |
7 | EE | Shari Murray,
Gerald T. Mackulak,
John W. Fowler,
Theron Colvin:
A simulation-based cost modeling methodology for evaluation of interbay material handling in a semiconductor wafer fab.
Winter Simulation Conference 2000: 1510-1517 |
6 | EE | Shwu-Min Horng,
John W. Fowler,
Jeffery K. Cochran:
A genetic algorithm approach to manage ion implantation processes in wafer fabrication.
IJMTM 1(2/3): 156-172 (2000) |
1999 |
5 | EE | Matt Hickie,
John W. Fowler:
Ancillary effects of simulation.
Winter Simulation Conference 1999: 754-758 |
4 | EE | Sungmin Park,
John W. Fowler,
W. Matthew Carlyle,
Matt Hickie:
Assessment of potential gains in productivity due to proactive reticle management using discrete event simulation.
Winter Simulation Conference 1999: 856-864 |
1998 |
3 | EE | John W. Fowler,
Michael C. Fu,
Lee Schruben,
Steven Brown,
Frank Chance,
Sean Cunningham,
Courtland Hilton,
Mani Janakiram,
Richard Stafford,
James Hutchby:
Operational Modeling and Simulation in Semiconductor Manufacturing.
Winter Simulation Conference 1998: 1035 |
1996 |
2 | EE | Scott J. Mason,
Paul A. Jensen,
John W. Fowler:
A Comparison Study of the Logic of Four Wafer Fabrication Simulators.
Winter Simulation Conference 1996: 1031-1038 |
1 | EE | Frank Chance,
Jennifer Robinson,
John W. Fowler:
Supporting Manufacturing with Simulation: Model Design, Development, and Deployment.
Winter Simulation Conference 1996: 114-121 |