2009 |
20 | EE | Sukgon Kim,
Reha Uzsoy:
Heuristics for capacity planning problems with congestion.
Computers & OR 36(6): 1924-1934 (2009) |
2008 |
19 | EE | Chen-Fu Chien,
Stéphane Dauzère-Pérès,
Hans Ehm,
John W. Fowler,
Zhibin Jiang,
Shekar Krishnaswamy,
Lars Mönch,
Reha Uzsoy:
Modeling and analysis of semiconductor manufacturing in a shrinking world: Challenges and successes.
Winter Simulation Conference 2008: 2093-2099 |
18 | EE | Durmus Fatih Irdem,
Necip Baris Kacar,
Reha Uzsoy:
An experimental study of an iterative simulation-optimization algorithm for production planning.
Winter Simulation Conference 2008: 2176-2184 |
17 | EE | Abhijit Upasani,
Reha Uzsoy:
Incorporating manufacturing lead times in joint production-marketing models: A review and some future directions.
Annals OR 161(1): 171-188 (2008) |
16 | EE | Reha Uzsoy,
Juan Diego Velásquez:
Heuristics for minimizing maximum lateness on a single machine with family-dependent set-up times.
Computers & OR 35(6): 2018-2033 (2008) |
2007 |
15 | EE | Seza Orcun,
Sila Çetinkaya,
Reha Uzsoy:
Determining safety stocks in the presence of workload-dependent lead times.
Winter Simulation Conference 2007: 1691-1698 |
14 | EE | Sujay Malve,
Reha Uzsoy:
A genetic algorithm for minimizing maximum lateness on parallel identical batch processing machines with dynamic job arrivals and incompatible job families.
Computers & OR 34(10): 3016-3028 (2007) |
13 | EE | Vishal A. Varma,
Reha Uzsoy,
Joseph Pekny,
Gary Blau:
Lagrangian heuristics for scheduling new product development projects in the pharmaceutical industry.
J. Heuristics 13(5): 403-433 (2007) |
12 | EE | Karthik Sourirajan,
Reha Uzsoy:
Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication.
J. Scheduling 10(1): 41-65 (2007) |
2006 |
11 | EE | Seza Orcun,
Reha Uzsoy,
Karl G. Kempf:
Using system dynamics simulations to compare capacity models for production planning.
Winter Simulation Conference 2006: 1855-1862 |
10 | EE | Christopher Geiger,
Reha Uzsoy,
Haldun Aytug:
Rapid Modeling and Discovery of Priority Dispatching Rules: An Autonomous Learning Approach.
J. Scheduling 9(1): 7-34 (2006) |
2005 |
9 | EE | Haldun Aytug,
Mark A. Lawley,
Kenneth McKay,
Shantha Mohan,
Reha Uzsoy:
Executing production schedules in the face of uncertainties: A review and some future directions.
European Journal of Operational Research 161(1): 86-110 (2005) |
8 | EE | Erdem Eskigun,
Reha Uzsoy,
Paul V. Preckel,
George Beaujon,
Subramanian Krishnan,
Jeffrey D. Tew:
Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers.
European Journal of Operational Research 165(1): 182-206 (2005) |
2002 |
7 | EE | Cheng-Shuo Wang,
Reha Uzsoy:
A genetic algorithm to minimize maximum lateness on a batch processing machine.
Computers & OR 29(12): 1621-1640 (2002) |
2001 |
6 | | Ronald L. Rardin,
Reha Uzsoy:
Experimental Evaluation of Heuristic Optimization Algorithms: A Tutorial.
J. Heuristics 7(3): 261-304 (2001) |
2000 |
5 | EE | Elif Akçali,
Reha Uzsoy,
David G. Hiscock,
Anne L. Moser,
Timothy J. Teyner:
Alternative loading and dispatching policies for furnace operations in semiconductor manufacturing: a comparison by simulation.
Winter Simulation Conference 2000: 1428-1435 |
4 | | Irfan M. Ovacik,
Srikanth Rajagopalan,
Reha Uzsoy:
Integrating Interval Estimates of Global Optima and Local Search Methods for Combinatorial Optimization Problems.
J. Heuristics 6(4): 481-500 (2000) |
1999 |
3 | | Miae Woo,
Reha Uzsoy,
Arif Ghafoor:
Media Streams Scheduling for Synchronization in Distributed Multimedia Systems.
J. Parallel Distrib. Comput. 56(3): 272-295 (1999) |
1997 |
2 | | Ebru Demirkol,
Sanjay Mehta,
Reha Uzsoy:
A Computational Study of Shifting Bottleneck Procedures for Shop Scheduling Problems.
J. Heuristics 3(2): 111-137 (1997) |
1996 |
1 | EE | Suresh Chand,
Rodney Traub,
Reha Uzsoy:
An iterative heuristic for the single machine dynamic total completion time scheduling problem.
Computers & OR 23(7): 641-651 (1996) |