![]() |
| 2007 | ||
|---|---|---|
| 2 | EE | S. Afshin Mansouri, S. Hamed Hendizadeh, Nasser Salmasi: Bicriteria two-machine flowshop scheduling using metaheuristics. GECCO 2007: 909 |
| 2006 | ||
| 1 | EE | Rasaratnam Logendran, Nasser Salmasi, Chelliah Sriskandarajah: Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. Computers & OR 33: 158-180 (2006) |
| 1 | S. Hamed Hendizadeh | [2] |
| 2 | Rasaratnam Logendran | [1] |
| 3 | S. Afshin Mansouri | [2] |
| 4 | Chelliah Sriskandarajah | [1] |