![]() |
| 2007 | ||
|---|---|---|
| 7 | EE | Rasaratnam Logendran, Brent McDonell, Byran Smucker: Scheduling unrelated parallel machines with sequence-dependent setups. Computers & OR 34(11): 3420-3438 (2007) |
| 6 | EE | Shakib Shakeri, Rasaratnam Logendran: A mathematical programming-based scheduling framework for multitasking environments. European Journal of Operational Research 176(1): 193-209 (2007) |
| 2006 | ||
| 5 | EE | Rasaratnam Logendran, Nasser Salmasi, Chelliah Sriskandarajah: Two-machine group scheduling problems in discrete parts manufacturing with sequence-dependent setups. Computers & OR 33: 158-180 (2006) |
| 1997 | ||
| 4 | EE | Rasaratnam Logendran, Parthasarathi Ramakrishna: A methodology for simultaneously dealing with machine duplication and part subcontracting in cellular manufacturing systems. Computers & OR 24(2): 97-116 (1997) |
| 1995 | ||
| 3 | EE | Sang-jin Nam, Rasaratnam Logendran: Modified production switching heuristics for aggregate production planning. Computers & OR 22(5): 531-541 (1995) |
| 1988 | ||
| 2 | EE | Rasaratnam Logendran, M. Palmer Terrell: Uncapacitated plant location-allocation problems with price sensitive stochastic demands. Computers & OR 15(2): 189-198 (1988) |
| 1986 | ||
| 1 | EE | C. Patrick Koelling, Rasaratnam Logendran: Waste-water treatment: Design and optimization using nonlinear search techniques. Computers & OR 13(1): 69-84 (1986) |
| 1 | C. Patrick Koelling | [1] |
| 2 | Brent McDonell | [7] |
| 3 | Sang-jin Nam | [3] |
| 4 | Parthasarathi Ramakrishna | [4] |
| 5 | Nasser Salmasi | [5] |
| 6 | Shakib Shakeri | [6] |
| 7 | Byran Smucker | [7] |
| 8 | Chelliah Sriskandarajah | [5] |
| 9 | M. Palmer Terrell | [2] |