2006 | ||
---|---|---|
6 | EE | J. Sudhir Ryan Daniel, Chandrasekharan Rajendran: Heuristic approaches to determine base-stock levels in a serial supply chain with a single objective and with multiple objectives. European Journal of Operational Research 175(1): 566-592 (2006) |
5 | EE | George Issac, Chandrasekharan Rajendran, R. N. Anantharaman: An instrument for the measurement of customer perceptions of quality management in the software industry: An empirical study in India. Software Quality Journal 14(4): 291-308 (2006) |
2005 | ||
4 | EE | T. K. Varadharajan, Chandrasekharan Rajendran: A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs. European Journal of Operational Research 167(3): 772-795 (2005) |
2004 | ||
3 | EE | Chandrasekharan Rajendran, Hans Ziegler: Ant-colony algorithms for permutation flowshop scheduling to minimize makespan/total flowtime of jobs. European Journal of Operational Research 155(2): 426-438 (2004) |
2 | EE | M. S. Jayamohan, Chandrasekharan Rajendran: Development and analysis of cost-based dispatching rules for job shop scheduling. European Journal of Operational Research 157(2): 307-321 (2004) |
2003 | ||
1 | EE | Chandrasekharan Rajendran, Hans Ziegler: Scheduling to minimize the sum of weighted flowtime and weighted tardiness of jobs in a flowshop with sequence-dependent setup times. European Journal of Operational Research 149(3): 513-522 (2003) |
1 | R. N. Anantharaman | [5] |
2 | J. Sudhir Ryan Daniel | [6] |
3 | George Issac | [5] |
4 | M. S. Jayamohan | [2] |
5 | T. K. Varadharajan | [4] |
6 | Hans Ziegler | [1] [3] |