2005 | ||
---|---|---|
1 | EE | T. K. Varadharajan, Chandrasekharan Rajendran: A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs. European Journal of Operational Research 167(3): 772-795 (2005) |
1 | Chandrasekharan Rajendran | [1] |