2008 |
10 | EE | Michele Ciavotta,
Paolo Detti,
Carlo Meloni,
Marco Pranzo:
A bi-objective coordination setup problem in a two-stage production system.
European Journal of Operational Research 189(3): 734-745 (2008) |
2007 |
9 | EE | Paolo Detti,
Carlo Meloni,
Marco Pranzo:
Local search algorithms for finding the Hamiltonian completion number of line graphs.
Annals OR 156(1): 5-24 (2007) |
8 | EE | Andrea D'Ariano,
Dario Pacciarelli,
Marco Pranzo:
A branch and bound algorithm for scheduling trains in a railway network.
European Journal of Operational Research 183(2): 643-657 (2007) |
7 | EE | Andrea D'Ariano,
Marco Pranzo,
Ingo A. Hansen:
Conflict Resolution and Train Speed Coordination for Solving Real-Time Timetable Perturbations.
IEEE Transactions on Intelligent Transportation Systems 8(2): 208-222 (2007) |
2006 |
6 | EE | Rubén Ruiz,
Marco Pranzo:
Holger H. Hoos and Thomas Stützle, Stochastic Local Search: Foundations and Applications, Morgan Kaufmann Publishers (2005).
European Journal of Operational Research 172(2): 716-718 (2006) |
2005 |
5 | | Dario Pacciarelli,
Marco Pranzo,
Juan Jose Cuadrado-Gallego,
María Dolores Rodríguez-Moreno:
Optimizing Software Construction.
Software Engineering Research and Practice 2005: 476-482 |
2004 |
4 | EE | Carlo Meloni,
Dario Pacciarelli,
Marco Pranzo:
A Rollout Metaheuristic for Job Shop Scheduling Problems.
Annals OR 131(1-4): 215-235 (2004) |
3 | EE | Paolo Detti,
Carlo Meloni,
Marco Pranzo:
Minimum Dominating Trail Set for Two-Terminal Series Parallel Graphs.
Electronic Notes in Discrete Mathematics 17: 117-122 (2004) |
2 | EE | Marco Pranzo:
Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times.
European Journal of Operational Research 153(3): 581-592 (2004) |
2003 |
1 | EE | Marco Pranzo,
Carlo Meloni,
Dario Pacciarelli:
A New Class of Greedy Heuristics for Job Shop Scheduling Problems.
WEA 2003: 223-236 |