| 2008 |
| 14 | EE | Marta Flamini,
Dario Pacciarelli:
Real time management of a metro rail terminus.
European Journal of Operational Research 189(3): 746-761 (2008) |
| 2007 |
| 13 | EE | Alessandro Agnetis,
Dario Pacciarelli,
Andrea Pacifici:
Multi-agent single machine scheduling.
Annals OR 150(1): 3-15 (2007) |
| 12 | EE | Andrea D'Ariano,
Dario Pacciarelli,
Marco Pranzo:
A branch and bound algorithm for scheduling trains in a railway network.
European Journal of Operational Research 183(2): 643-657 (2007) |
| 2006 |
| 11 | EE | Alessandro Agnetis,
Nicholas G. Hall,
Dario Pacciarelli:
Supply chain scheduling: Sequence coordination.
Discrete Applied Mathematics 154(15): 2044-2063 (2006) |
| 2005 |
| 10 | | Dario Pacciarelli,
Marco Pranzo,
Juan Jose Cuadrado-Gallego,
María Dolores Rodríguez-Moreno:
Optimizing Software Construction.
Software Engineering Research and Practice 2005: 476-482 |
| 2004 |
| 9 | EE | Carlo Meloni,
Dario Pacciarelli,
Marco Pranzo:
A Rollout Metaheuristic for Job Shop Scheduling Problems.
Annals OR 131(1-4): 215-235 (2004) |
| 2003 |
| 8 | EE | Marco Pranzo,
Carlo Meloni,
Dario Pacciarelli:
A New Class of Greedy Heuristics for Job Shop Scheduling Problems.
WEA 2003: 223-236 |
| 2002 |
| 7 | | Gaia Nicosia,
Dario Pacciarelli,
Andrea Pacifici:
Optimally balancing assembly lines with different workstations.
Discrete Applied Mathematics 118(1-2): 99-113 (2002) |
| 6 | EE | Alessandro Mascis,
Dario Pacciarelli:
Job-shop scheduling with blocking and no-wait constraints.
European Journal of Operational Research 143(3): 498-517 (2002) |
| 2001 |
| 5 | EE | Alessandro Agnetis,
Paolo Detti,
Carlo Meloni,
Dario Pacciarelli:
Set-Up Coordination between Two Stages of a Supply Chain.
Annals OR 107(1-4): 15-32 (2001) |
| 4 | EE | Alessandro Agnetis,
Paolo Detti,
Carlo Meloni,
Dario Pacciarelli:
A linear algorithm for the Hamiltonian completion number of the line graph of a tree.
Inf. Process. Lett. 79(1): 17-24 (2001) |
| 2000 |
| 3 | EE | Alessandro Agnetis,
Dario Pacciarelli:
Part sequencing in three-machine no-wait robotic cells.
Oper. Res. Lett. 27(4): 185-192 (2000) |
| 1999 |
| 2 | EE | Claudio Arbib,
Dario Pacciarelli,
Stefano Smriglio:
A Three-dimensional Matching Model for Perishable Production Scheduling.
Discrete Applied Mathematics 92(1): 1-15 (1999) |
| 1997 |
| 1 | EE | Alessandro Agnetis,
Dario Pacciarelli,
Fabrizio Rossi:
Batch Scheduling in a Two-machine Flow Shop with Limited Buffer.
Discrete Applied Mathematics 72(3): 243-260 (1997) |