2008 |
5 | EE | Roberto F. Lu,
Cliff J. Kirkham:
A Six Sigma DMADV project: The 787 LCF scheduling tool.
Winter Simulation Conference 2008: 2927 |
4 | EE | Roberto F. Lu,
Swee Leong,
Niles Bengtsson,
Björn Johansson,
Frank Riddick,
Y. Tina Lee,
Guodong Shao,
Charles McLean,
Al Salour,
Laurance N. Hazlehurst,
Sidney Ly:
Implementation of Core Manufacturing Simulation Data in aerospace industry.
Winter Simulation Conference 2008: 2930 |
2003 |
3 | EE | Roberto F. Lu,
Guixiu Qiao,
Charles McLean:
Manufacturing case studies: NIST XML simulation interface specification at Boeing: a case study.
Winter Simulation Conference 2003: 1230-1237 |
2 | EE | Charles McLean,
Swee Leong,
Charley Harrell,
Philomena M. Zimmerman,
Roberto F. Lu:
Simulation standards: current status, needs, future directions, panel: simulation standards: current status, needs, and future directions.
Winter Simulation Conference 2003: 2019-2026 |
2002 |
1 | EE | Roberto F. Lu,
Shankar Sundaram:
Manufacturing 3: manufacturing process modeling of Boeing 747 moving line concepts.
Winter Simulation Conference 2002: 1041-1045 |