| 2009 |
| 27 | EE | Christos Koulamas:
A faster fully polynomial approximation scheme for the single-machine total tardiness problem.
European Journal of Operational Research 193(2): 637-638 (2009) |
| 26 | EE | Christos Koulamas,
George J. Kyparisis:
A note on the proportionate flow shop with a bottleneck machine.
European Journal of Operational Research 193(2): 644-645 (2009) |
| 25 | EE | Christos Koulamas,
George J. Kyparisis:
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem.
European Journal of Operational Research 196(1): 61-68 (2009) |
| 2008 |
| 24 | EE | Christos Koulamas,
George J. Kyparisis:
An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines.
European Journal of Operational Research 187(2): 660-666 (2008) |
| 23 | EE | Christos Koulamas,
George J. Kyparisis:
Single-machine scheduling problems with past-sequence-dependent setup times.
European Journal of Operational Research 187(3): 1045-1049 (2008) |
| 22 | EE | Christos Koulamas,
George J. Kyparisis:
Single-machine scheduling with waiting-time-dependent due dates.
European Journal of Operational Research 191(2): 577-581 (2008) |
| 2007 |
| 21 | EE | Christos Koulamas,
Aggeliki S. Prayati,
George D. Papadopoulos:
A framework for the implementation of adaptive streaming systems.
WMuNeP 2007: 23-26 |
| 20 | EE | Christos Koulamas,
George J. Kyparisis:
Single-machine and two-machine flowshop scheduling with general learning functions.
European Journal of Operational Research 178(2): 402-407 (2007) |
| 19 | EE | Christos Koulamas,
George J. Kyparisis:
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines.
European Journal of Operational Research 182(2): 945-951 (2007) |
| 2006 |
| 18 | EE | Christos Koulamas,
Aggeliki S. Prayati,
Gauthier Lafruit,
George D. Papadopoulos:
Measurements and modeling of resource consumption in wireless video streaming: the decoder case.
WMuNeP 2006: 67-72 |
| 17 | EE | George J. Kyparisis,
Christos Koulamas:
Flexible flow shop scheduling with uniform parallel machines.
European Journal of Operational Research 168(3): 985-997 (2006) |
| 16 | EE | Jatinder N. D. Gupta,
Christos Koulamas,
George J. Kyparisis:
Performance guarantees for flowshop heuristics to minimize makespan.
European Journal of Operational Research 169(3): 865-872 (2006) |
| 2005 |
| 15 | EE | Christos Koulamas,
George J. Kyparisis:
A correction to "Single machine scheduling with release times, deadlines and tardiness objectives" [EJOR 133 (2001) 447-453].
European Journal of Operational Research 160(2): 574-575 (2005) |
| 2004 |
| 14 | EE | Jatinder N. D. Gupta,
Christos Koulamas,
George J. Kyparisis,
Chris N. Potts,
Vitaly A. Strusevich:
Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan.
Annals OR 129(1-4): 171-185 (2004) |
| 13 | EE | Christos Koulamas,
George J. Kyparisis:
Concurrent flowshop scheduling to minimize makespan.
European Journal of Operational Research 156(2): 524-529 (2004) |
| 12 | EE | Christos Koulamas,
George J. Kyparisis:
Makespan minimization on uniform parallel machines with release times.
European Journal of Operational Research 157(1): 262-266 (2004) |
| 2002 |
| 11 | EE | George J. Kyparisis,
Christos Koulamas:
Assembly-Line Scheduling with Concurrent Operations and Parallel Machines.
INFORMS Journal on Computing 14(1): 68-80 (2002) |
| 2001 |
| 10 | EE | Christos Koulamas,
George J. Kyparisis:
The three-stage assembly flowshop scheduling problem.
Computers & OR 28(7): 689-704 (2001) |
| 9 | EE | George J. Kyparisis,
Christos Koulamas:
A note on weighted completion time minimization in a flexible flow shop.
Oper. Res. Lett. 29(1): 5-11 (2001) |
| 8 | EE | Radovan D. Stojanovic,
Panagiotis Mitropulos,
Christos Koulamas,
Yorgos Karayiannis,
Stavros A. Koubias,
George D. Papadopoulos:
Real-Time Vision-Based System for Textile Fabric Inspection.
Real-Time Imaging 7(6): 507-518 (2001) |
| 2000 |
| 7 | EE | George J. Kyparisis,
Christos Koulamas:
Open shop scheduling with makespan and total completion time criteria.
Computers & OR 27(1): 15-27 (2000) |
| 6 | EE | Christos Koulamas,
George J. Kyparisis:
Scheduling on uniform parallel machines to minimize maximum lateness.
Oper. Res. Lett. 26(4): 175-179 (2000) |
| 1998 |
| 5 | EE | Christos Koulamas:
A guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problem.
Computers & OR 25(2): 83-89 (1998) |
| 1997 |
| 4 | EE | George J. Kyparisis,
Christos Koulamas:
Open Shop Scheduling with Maximal Machines.
Discrete Applied Mathematics 78(1-3): 175-187 (1997) |
| 1996 |
| 3 | EE | Eleftherios Iakovou,
Chi M. Ip,
Christos Koulamas:
Machining economics with phase-type distributed tool lives and periodic maintenance control.
Computers & OR 23(1): 53-62 (1996) |
| 2 | EE | Christos Koulamas:
Scheduling two parallel semiautomatic machines to minimize machine interference.
Computers & OR 23(10): 945-956 (1996) |
| 1992 |
| 1 | EE | Christos Koulamas:
A stochastic model for a machining cell with tool failure and tool replacement considerations.
Computers & OR 19(8): 717-729 (1992) |