2009 |
21 | EE | George J. Kyparisis:
Sensitivity Analysis of Complementarity Problems.
Encyclopedia of Optimization 2009: 3445-3447 |
20 | EE | George J. Kyparisis:
Sensitivity Analysis of Variational Inequality Problems.
Encyclopedia of Optimization 2009: 3447-3450 |
19 | EE | Christos Koulamas,
George J. Kyparisis:
A note on the proportionate flow shop with a bottleneck machine.
European Journal of Operational Research 193(2): 644-645 (2009) |
18 | EE | Christos Koulamas,
George J. Kyparisis:
A modified LPT algorithm for the two uniform parallel machine makespan minimization problem.
European Journal of Operational Research 196(1): 61-68 (2009) |
2008 |
17 | EE | Christos Koulamas,
George J. Kyparisis:
An improved delayed-start LPT algorithm for a partition problem on two identical parallel machines.
European Journal of Operational Research 187(2): 660-666 (2008) |
16 | EE | Christos Koulamas,
George J. Kyparisis:
Single-machine scheduling problems with past-sequence-dependent setup times.
European Journal of Operational Research 187(3): 1045-1049 (2008) |
15 | EE | Christos Koulamas,
George J. Kyparisis:
Single-machine scheduling with waiting-time-dependent due dates.
European Journal of Operational Research 191(2): 577-581 (2008) |
2007 |
14 | EE | Christos Koulamas,
George J. Kyparisis:
Single-machine and two-machine flowshop scheduling with general learning functions.
European Journal of Operational Research 178(2): 402-407 (2007) |
13 | EE | Christos Koulamas,
George J. Kyparisis:
A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines.
European Journal of Operational Research 182(2): 945-951 (2007) |
2006 |
12 | EE | George J. Kyparisis,
Christos Koulamas:
Flexible flow shop scheduling with uniform parallel machines.
European Journal of Operational Research 168(3): 985-997 (2006) |
11 | EE | Jatinder N. D. Gupta,
Christos Koulamas,
George J. Kyparisis:
Performance guarantees for flowshop heuristics to minimize makespan.
European Journal of Operational Research 169(3): 865-872 (2006) |
2005 |
10 | EE | Christos Koulamas,
George J. Kyparisis:
A correction to "Single machine scheduling with release times, deadlines and tardiness objectives" [EJOR 133 (2001) 447-453].
European Journal of Operational Research 160(2): 574-575 (2005) |
2004 |
9 | EE | Jatinder N. D. Gupta,
Christos Koulamas,
George J. Kyparisis,
Chris N. Potts,
Vitaly A. Strusevich:
Scheduling Three-Operation Jobs in a Two-Machine Flow Shop to Minimize Makespan.
Annals OR 129(1-4): 171-185 (2004) |
8 | EE | Christos Koulamas,
George J. Kyparisis:
Concurrent flowshop scheduling to minimize makespan.
European Journal of Operational Research 156(2): 524-529 (2004) |
7 | EE | Christos Koulamas,
George J. Kyparisis:
Makespan minimization on uniform parallel machines with release times.
European Journal of Operational Research 157(1): 262-266 (2004) |
2002 |
6 | EE | George J. Kyparisis,
Christos Koulamas:
Assembly-Line Scheduling with Concurrent Operations and Parallel Machines.
INFORMS Journal on Computing 14(1): 68-80 (2002) |
2001 |
5 | EE | Christos Koulamas,
George J. Kyparisis:
The three-stage assembly flowshop scheduling problem.
Computers & OR 28(7): 689-704 (2001) |
4 | EE | George J. Kyparisis,
Christos Koulamas:
A note on weighted completion time minimization in a flexible flow shop.
Oper. Res. Lett. 29(1): 5-11 (2001) |
2000 |
3 | EE | George J. Kyparisis,
Christos Koulamas:
Open shop scheduling with makespan and total completion time criteria.
Computers & OR 27(1): 15-27 (2000) |
2 | EE | Christos Koulamas,
George J. Kyparisis:
Scheduling on uniform parallel machines to minimize maximum lateness.
Oper. Res. Lett. 26(4): 175-179 (2000) |
1997 |
1 | EE | George J. Kyparisis,
Christos Koulamas:
Open Shop Scheduling with Maximal Machines.
Discrete Applied Mathematics 78(1-3): 175-187 (1997) |