2007 |
8 | EE | Alireza Rahimi-Vahed,
Masoud Rabbani,
Reza Tavakkoli-Moghaddam,
S. Ali Torabi,
Fariborz Jolai:
A multi-objective scatter search for a mixed-model assembly line sequencing problem.
Advanced Engineering Informatics 21(1): 85-99 (2007) |
7 | EE | Fariborz Jolai,
M. J. Rezaee,
Masoud Rabbani,
J. Razmi,
Pariviz Fattahi:
Exact algorithm for bi-objective 0-1 knapsack problem.
Applied Mathematics and Computation 194(2): 544-551 (2007) |
6 | EE | Fariborz Jolai,
Masoud Rabbani,
S. Amalnick,
A. Dabaghi,
M. Dehghan,
M. Yazadn Parast:
Genetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobs.
Applied Mathematics and Computation 194(2): 552-560 (2007) |
5 | EE | Masoud Rabbani,
S. M. T. Fatemi Ghomi,
Fariborz Jolai,
N. S. Lahiji:
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept.
European Journal of Operational Research 176(2): 794-808 (2007) |
2006 |
4 | EE | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Fariborz Jolai:
Minimizing Makespan on a Single Batch Processing Machine with Non-identical Job Sizes: A Hybrid Genetic Approach.
EvoCOP 2006: 135-146 |
3 | EE | Alireza Rahimi-Vahed,
Masoud Rabbani,
Reza Tavakkoli-Moghaddam,
Fariborz Jolai,
Neda Manavizadeh:
Mixed-Model Assembly Line Sequencing Using Real Options.
OR 2006: 161-167 |
2005 |
2 | EE | Reza Tavakkoli-Moghaddam,
Fariborz Jolai,
F. Vaziri,
P. K. Ahmed,
Amir Azaron:
A hybrid method for solving stochastic job shop scheduling problems.
Applied Mathematics and Computation 170(1): 185-206 (2005) |
1 | EE | Fariborz Jolai:
Minimizing number of tardy jobs on a batch processing machine with incompatible job families.
European Journal of Operational Research 162(1): 184-190 (2005) |