2008 |
8 | EE | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Masoud Jenabi:
A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes.
Computers & OR 35(4): 1084-1098 (2008) |
2007 |
7 | EE | H. Zolfi,
S. M. T. Fatemi Ghomi,
Behrooz Karimi:
Supply Chain Operations Planning with Setup Times and Multi Period Capacity Consumption.
APMS 2007: 69-76 |
6 | EE | Masoud Jenabi,
S. M. T. Fatemi Ghomi,
S. Ali Torabi,
Behrooz Karimi:
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines.
Applied Mathematics and Computation 186(1): 230-245 (2007) |
2006 |
5 | EE | Ali Husseinzadeh Kashan,
Behrooz Karimi,
Fariborz Jolai:
Minimizing Makespan on a Single Batch Processing Machine with Non-identical Job Sizes: A Hybrid Genetic Approach.
EvoCOP 2006: 135-146 |
4 | EE | Saied Samie,
Behrooz Karimi:
Two-Machine No-Wait Flow Shop Scheduling Problem with Precedence Constraints.
OR 2006: 191-196 |
3 | EE | H. Khademi Zare,
S. M. T. Fatemi Ghomi,
Behrooz Karimi:
Developing a heuristic algorithm for order production planning using network models under uncertainty conditions.
Applied Mathematics and Computation 182(2): 1208-1218 (2006) |
2 | EE | B. Akrami,
Behrooz Karimi,
S. M. Moattar Husseini:
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: The finite horizon case.
Applied Mathematics and Computation 183(1): 634-645 (2006) |
1 | EE | S. Ali Torabi,
S. M. T. Fatemi Ghomi,
Behrooz Karimi:
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains.
European Journal of Operational Research 173(1): 173-189 (2006) |