2007 | ||
---|---|---|
1 | EE | Fariborz Jolai, Masoud Rabbani, S. Amalnick, A. Dabaghi, M. Dehghan, M. Yazadn Parast: Genetic algorithm for bi-criteria single machine scheduling problem of minimizing maximum earliness and number of tardy jobs. Applied Mathematics and Computation 194(2): 552-560 (2007) |
1 | S. Amalnick | [1] |
2 | A. Dabaghi | [1] |
3 | Fariborz Jolai | [1] |
4 | M. Yazadn Parast | [1] |
5 | Masoud Rabbani | [1] |