| 2009 |
| 19 | EE | J. Benton,
Minh Binh Do,
Subbarao Kambhampati:
Anytime heuristic search for partial satisfaction planning.
Artif. Intell. 173(5-6): 562-592 (2009) |
| 2008 |
| 18 | | Lukas Kuhn,
Bob Price,
Johan de Kleer,
Minh Binh Do,
Rong Zhou:
Pervasive Diagnosis: The Integration of Diagnostic Goals into Production Plans.
AAAI 2008: 1306-1312 |
| 17 | | Minh Binh Do,
Wheeler Ruml,
Rong Zhou:
On-line Planning and Scheduling: An Application to Controlling Modular Printers.
AAAI 2008: 1519-1523 |
| 16 | | Minh Binh Do,
Wheeler Ruml,
Rong Zhou:
Planning for Modular Printers: Beyond Productivity.
ICAPS 2008: 68-75 |
| 2007 |
| 15 | EE | Minh Binh Do,
J. Benton,
Menkes van den Briel,
Subbarao Kambhampati:
Planning with Goal Utility Dependencies.
IJCAI 2007: 1872-1878 |
| 14 | EE | Biplav Srivastava,
Tuan A. Nguyen,
Alfonso Gerevini,
Subbarao Kambhampati,
Minh Binh Do,
Ivan Serina:
Domain Independent Approaches for Finding Diverse Plans.
IJCAI 2007: 2016-2022 |
| 13 | EE | Wheeler Ruml,
Minh Binh Do:
Best-First Utility-Guided Search.
IJCAI 2007: 2378-2384 |
| 2006 |
| 12 | | Minh Binh Do,
Wheeler Ruml:
Lessons Learned in Applying Domain-Independent Planning to High-Speed Manufacturing.
ICAPS 2006: 370-373 |
| 2005 |
| 11 | | Wheeler Ruml,
Minh Binh Do,
Markus P. J. Fromherz:
On-line Planning and Scheduling for High-speed Manufacturing.
ICAPS 2005: 30-39 |
| 10 | EE | J. Benton,
Minh Binh Do,
Subbarao Kambhampati:
Over-Subscription Planning with Numeric Goals.
IJCAI 2005: 1207-1213 |
| 2004 |
| 9 | | Menkes van den Briel,
Romeo Sanchez Nigenda,
Minh Binh Do,
Subbarao Kambhampati:
Effective Approaches for Partial Satisfaction (Over-Subscription) Planning.
AAAI 2004: 562-569 |
| 2003 |
| 8 | | Minh Binh Do,
Subbarao Kambhampati:
Improving Temporal Flexibility of Position Constrained Metric Temporal Plans.
ICAPS 2003: 42-51 |
| 7 | EE | Minh Binh Do,
Subbarao Kambhampati:
Sapa: A Multi-objective Metric Temporal Planner.
J. Artif. Intell. Res. (JAIR) 20: 155-194 (2003) |
| 2002 |
| 6 | | Minh Binh Do,
Subbarao Kambhampati:
Planning Graph-based Heuristics for Cost-sensitive Temporal Planning.
AIPS 2002: 3-12 |
| 5 | | Minh Binh Do,
Subbarao Kambhampati:
Improving the Temporal Flexibility of Position Constrained Temporal Plans.
AIPS Workshop on Planning for Temporal Domains 2002: 41-46 |
| 2001 |
| 4 | EE | Biplav Srivastava,
Subbarao Kambhampati,
Minh Binh Do:
Planning the project management way: Efficient planning by effective integration of causal and resource reasoning in RealPlan.
Artif. Intell. 131(1-2): 73-134 (2001) |
| 3 | EE | Minh Binh Do,
Subbarao Kambhampati:
Planning as constraint satisfaction: Solving the planning graph by compiling it into CSP.
Artif. Intell. 132(2): 151-182 (2001) |
| 2000 |
| 2 | | Minh Binh Do,
Biplav Srivastava,
Subbarao Kambhampati:
Investigating the Effect of Relevance and Reachability Constraints on SAT Encodings of Planning.
AIPS 2000: 308-314 |
| 1 | | Minh Binh Do,
Subbarao Kambhampati:
Solving Planning-Graph by Compiling It into CSP.
AIPS 2000: 82-91 |