2008 |
14 | EE | Wojciech Bozejko,
Jaroslaw Pempera,
Adam Smutnicki:
Parallel Single-Thread Strategies in Scheduling.
ICAISC 2008: 995-1006 |
13 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Path-Relinking Method for the Flow Shop Scheduling Problem.
ICCS (1) 2008: 264-273 |
2007 |
12 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Scatter Search Algorithm for the Flow Shop Sequencing Problem.
PPAM 2007: 180-188 |
11 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
On the theoretical properties of swap multimoves.
Oper. Res. Lett. 35(2): 227-231 (2007) |
2006 |
10 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
A New Inter-island Genetic Operator for Optimization Problems with Block Properties.
ICAISC 2006: 334-343 |
9 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
A Fast Parallel Dynasearch Algorithm for Some Scheduling Problems.
PARELEC 2006: 275-280 |
2005 |
8 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
Task Realization's Optimization with Earliness and Tardiness Penalties in Distributed Computation Systems.
AWIC 2005: 69-75 |
7 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
A Hybrid Evolutionary Algorithm for some Discrete Optimization Problems.
ISDA 2005: 326-331 |
2004 |
6 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Genetic Algorithm for Minimizing Total Weighted Completion Time.
ICAISC 2004: 400-405 |
5 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
The New Concepts in Parallel Simulated Annealing Method.
ICAISC 2004: 853-859 |
4 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Tabu Search Method Approach for Very Difficult Permutation Scheduling Problems.
PARELEC 2004: 156-161 |
2003 |
3 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
Parallel Genetic Algorithm for the Flow Shop Scheduling Problem.
PPAM 2003: 566-571 |
2002 |
2 | EE | Wojciech Bozejko,
Mieczyslaw Wodecki:
Solving the Flow Shop Problem by Parallel Tabu Search.
PARELEC 2002: 189-194 |
2001 |
1 | EE | Mieczyslaw Wodecki,
Wojciech Bozejko:
Solving the Flow Shop Problem by Parallel Simulated Annealing.
PPAM 2001: 236-246 |